E

Enchanted Rock

Managed natural gas microgrids for reliability

Construction Superintendent

Full-Time
No salary listed
Mid
Houston, TX, USA
In Person
Architecture & Civil EngineeringConstruction Management

About the job

Requirements
  • At least two years of experience as a journeyman installing, maintaining, and repairing electrical systems, equipment, and fixtures using blueprints, schematics, and sketches.
  • Pass a background check, including a drug test.
  • Experience using hand tools, small power tools, shop machines, and heavy equipment.
  • Experience inspecting installation sites.
  • Experience studying work orders, building plans, and installation manuals to determine material requirements and installation procedures.
  • Experience reading contract drawings.
  • Experience installing and mounting electronic controls, device panels, sensors, and components.
  • Experience installing, assembling, testing, and maintaining electrical or electronic wiring, conduit, cable, equipment, components, and devices associated with electrical equipment, following electrical layout drawings and building plans.
  • Ability to perform interlock wiring as required.
  • Experience testing electrical systems and circuit continuity in wiring, equipment, and fixtures using testing devices.
  • Ability to diagnose malfunctions in systems, apparatus, and components using test equipment and hand tools, identify causes, and take appropriate corrective steps.
  • Ability to instruct and train workers to install, maintain, and repair electrical wiring, equipment, and fixtures.
  • Clear understanding of the latest edition of the National Electrical Code.
Responsibilities
  • Oversee construction projects from conception to completion, managing employees, subcontractors, inspectors, craft supervisors, and specialists at the job site throughout all construction phases.
  • Manage on-site and off-site construction to monitor compliance with building, quality, and safety regulations, and serve as on-site Safety Director to ensure safety policies, procedures, and methods are followed.
  • Conduct continuous surveillance of craft disciplines to ensure high-quality workmanship and conformance with approved engineering drawings, specifications, applicable codes, and construction practices.
  • Ensure quality construction standards and proper construction techniques, ensure staff and subcontractors follow quality control standards, and oversee completion of walk-through items.
  • Participate in design review meetings and provide feedback during the proposal process.
  • Review projects in depth to schedule deliverables and estimate costs; select tools, materials, and equipment, and track inventory.
  • Meet contractual performance conditions and report deviations.
  • Review work progress daily and prepare internal and external job-status reports.
  • Negotiate agreement terms and obtain permits and licenses to conform to the production schedule.
  • Analyze, manage, and mitigate risks by adjusting personnel and equipment resources to resolve construction problems and avoid delays.
  • Plan to prevent problems, resolve emerging issues, and address complaints.
  • Perform additional responsibilities as assigned by company management.

About the company

Enchanted Rock provides fully managed natural gas–powered microgrids as a resiliency service for mission-critical customers. It designs, installs, monitors 24/7, and maintains distributed generation systems that keep essential power on during grid failures, and these microgrids can feed power back to the grid when not in use to offset costs. The systems use natural gas and renewable natural gas to reduce emissions versus diesel backups, with potential for future hydrogen blending, and they are designed to be quieter with a smaller footprint. The company aims to improve power reliability for critical infrastructure while offering an affordable, sustainable backup option and creating revenue streams for clients through grid interconnections and reserve power services.

Company Size

201-500

Company Stage

IPO

Headquarters

Houston, Texas

Founded

2006

Get referred to Enchanted Rock

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • August 2026 backlog hit $1.7 billion, up tenfold year over year.
  • Anthropic ordered 470 MW in August 2026, validating AI data-center demand.
  • February 2026 Niki Herr and January 2026 Regis Malloy strengthened growth execution.

What critics are saying

  • August 14, 2026 Puerto Rico board revoked the $5.9 billion Power Expectations contract.
  • Q2 2026 adjusted EBITDA was negative $14 million despite $1.7 billion backlog.
  • Anthropic and Meta concentration plus sold-out capacity through 2028 creates execution strain.

What makes Enchanted Rock unique

  • June 2026 IPO gave ERock $554 million and no debt.
  • ERock’s natural-gas microgrids earn backup revenue and ERCOT grid-services revenue.
  • John Carrington and Thomas McAndrew keep energy and deal-making continuity after 2025.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Remote Work Options

Growth & Insights and Company News

6 month growth

5%

1 year growth

-1%

2 year growth

-1%
Yahoo Finance
Aug 13th, 2026
Erock soars 23% on $1.7B backlog from 470-MW Anthropic deal

Erock Inc. jumped 22.84% to $13.82 on Wednesday following a major equipment deal with Anthropic. The onsite power solutions provider secured a 470-MW order from Anthropic, pushing its contracted power system sales backlog to $1.7 billion and extending production commitments through 2028. The rally came despite weak second-quarter results. Erock posted net losses of $67.7 million, up 748% year-on-year due to IPO-related charges, whilst revenues fell 42% to $39.88 million. CEO John Carrington highlighted AI infrastructure's impact on power markets. The company began operations at its Hyperion manufacturing facility and started construction on a 366-MW project supporting Meta's data centre campus. For the full year, Erock targets revenues of $435 million to $465 million and adjusted EBITDA of $3 million to $9 million.

Yahoo Finance
Jul 19th, 2026
JPMorgan tips $700M fintech Wise and power firm ERock for rebounds after rough IPO debuts

J.P. Morgan has identified two recent IPO stocks with significant rebound potential despite post-listing struggles. ERock (EROC), which provides utility-scale power solutions for data centres and critical infrastructure, has fallen 42% since its June IPO that raised $600 million. J.P. Morgan analyst Mark Strouse rates it Overweight with a $24 price target, implying 122% upside. The company's natural gas-fired modular power systems address growing demand for backup power as grid reliability faces pressure. Wise (WSE), the fintech firm processing cross-border payments, has dropped 18% since moving its primary listing to Nasdaq in May. Despite regulatory scrutiny in Belgium, the company reported $2.5 billion revenue and $660.4 million pre-tax income in fiscal 2026. J.P. Morgan analyst Craig McDowell maintains an Overweight rating with a $17.50 target, suggesting 37% upside. Both stocks have Strong Buy or Moderate Buy consensus ratings from Wall Street analysts.

eRock
Jun 17th, 2026
Energy Impact Partners Invests in Enchanted Rock

Investment by Utility Partner Coalition in Leading Provider of Commercial and Industrial Microgrids and Backup Power Systems Will Drive…...

Investing.com
Jun 10th, 2026
ERock raises $600 million in U.S. initial public offering By Investing.com

ERock raises $600 million in U.S. initial public offering

Reuters
Jun 10th, 2026
Gas generator maker ERock raises $600 million in US IPO

ERock raised $600 million in its U.S. initial public offering, the natural gas generator maker said late ​on Tuesday, becoming the latest company to ‌debut amid a busy market for new listings.