V

Verdantas

Environmental consulting with GIS-driven risk assessment

Transmission and Substation Project Scheduler

Full-TimeUpdated on 10/27/2026
$129k
Senior
Bachelor's, Associate's
Houston, TX, USA
HybridHybrid position; must be local to the Houston office.
Project & Program ManagementProject Management

About the job

Requirements
  • An associate degree is required.
  • At least five years of project scheduling and/or project controls experience is required.
  • At least five years of hands-on experience using Primavera P6 and Microsoft Project is required.
  • The candidate must be able to develop, baseline, update, maintain, and analyze Critical Path Method schedules for large capital projects.
  • Experience supporting major energy infrastructure projects is required.
  • Experience with project scheduling and control, document control and management, and Procore or similar software is required.
  • Experience with portfolio analytics and reporting is required.
  • Experience with risk assessment and mitigation planning is required.
  • The candidate must have a strong understanding of construction sequences, long-lead equipment procurement, utility outage coordination, testing, commissioning, and energization activities.
  • Advanced proficiency in Microsoft Excel is required.
  • Strong written, verbal, and presentation communication skills are required.
Responsibilities
  • Independently develop, baseline, and maintain detailed Critical Path Method schedules in Primavera P6 and Microsoft Project for assigned transmission line and substation projects, selecting project-appropriate logic and structure rather than relying on templates.
  • Integrate engineering milestones, permitting and regulatory approvals, long-lead equipment procurement, material deliveries, outage windows, construction sequences, testing, commissioning, and energization into a single defensible plan.
  • Establish and maintain the Work Breakdown Structure, activity coding, calendars, constraints, milestones, and resource assignments to program standards so schedules can be rolled up across the portfolio.
  • Perform critical-path and near-critical-path analysis, total and free float analysis, variance analysis, earned value analysis, what-if scenarios, time-impact analysis, and recovery scheduling.
  • Monitor float consumption and distinguish legitimate use from deterioration caused by delay, resequencing, rework, or late decisions.
  • Produce look-ahead schedules, schedule narratives, progress S-curves, resource histograms, milestone reports, and executive dashboards on the program reporting calendar.
  • Collect and validate progress from project managers, engineers, engineering, procurement, and construction contractors and teams, challenging status that is not supported by field evidence.
  • Assess schedule quality against defined metrics, open ends, negative float, excessive lags, constraint misuse, and out-of-sequence progress, and document deficiencies for resolution.
  • Require and evaluate narrative justification for material movement in float, logic, forecast dates, or critical-path activities.
  • Support development and continuous improvement of schedule governance, including the engineering, procurement, and construction schedule specification, scheduling procedures, and key performance indicator definitions.
  • Evaluate schedule impacts of change orders, scope changes, and delay claims, and support mitigation and recovery planning.
  • Communicate schedule status, variance, and forecast directly to owner project managers and program leadership, clearly and concisely, with a recommendation rather than raw data.
  • Lead schedule update and review meetings with the project team.
  • Present schedule performance in project, program, and milestone-readiness reviews internally among the project team.
  • Coordinate schedule information flow between discipline leads, procurement, construction management, and the project manager to maintain a single credible view of status.
  • Identify emerging schedule risk, constraint conflicts, long-lead slippage, outage-window exposure, permitting dependencies, and resource shortfalls, and escalate with impact analysis, alternatives, and a recommended action.
  • Escalate against defined thresholds and timeframes rather than waiting for a milestone to be missed.
  • Maintain schedule assumptions, mitigation commitments, and recovery actions in program risk and decision records, and track them to closure.
  • Mentor early-career staff on Primavera P6 practice, schedule quality, and client communication.
  • Contribute to onboarding and training of controls staff joining the program.
Desired Qualifications
  • A bachelor's degree in Engineering, Construction Management, Business, or a related field is preferred.
  • Experience supporting an owner's engineer, owner's representative, or utility capital program environment is preferred.
  • Experience reviewing, validating, and challenging engineering, procurement, and construction contractor schedules is preferred.
  • Familiarity with Earned Value Management and Time Impact Analysis is preferred.
  • Experience using Power BI or similar reporting and dashboard platforms is preferred.
  • Working knowledge of SAP, Unifier, or comparable enterprise resource planning or project management systems is preferred.
  • Experience using Copilot tool development is preferred.
  • Professional certifications such as Project Management Professional, PMI Scheduling Professional, or AACE Planning & Scheduling Professional are preferred.

About the company

Verdantas is an environmental consulting firm that helps clients plan, assess, remediate, and revitalize environmental assets. It uses GIS technology and risk assessment models to map digital infrastructure, prioritize funding, and guide brownfield remediation and sustainable planning. The company works with clients across industries in the United States, offering specialized consulting services that focus on environmental justice, asset management, and long-term environmental outcomes. Verdantas differentiates itself through a strong track record, 34 patents, and a growing presence on ENR's Top 500 Design Firms list, plus its emphasis on revitalizing undervalued assets and integrating science with planning. Its goal is to improve environmental health and sustainability by turning environmental challenges into value for clients and communities.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Tampa, Florida

Founded

2020

Get referred to Verdantas

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Pax added California environmental depth on August 12, 2026, expanding West Coast pull.
  • EPI and Sherwood broaden brownfield, water, and resilient infrastructure work with immediate cross-sell.
  • AEEC strengthens AI-driven environmental services, supporting higher-value digital monitoring contracts in 2026.

What critics are saying

  • Sterling must integrate six 2026 deals; culture clashes and margin leakage hit 2027 earnings.
  • PE-backed rollups invite integration debt; one failed acquisition chain breaks client continuity.
  • Public sector and regulated clients delay projects; a downturn in infrastructure budgets hits revenue fast.

What makes Verdantas unique

  • Verdantas now spans remediation, water, energy, and sustainable infrastructure after six 2026 acquisitions.
  • Sherwood and AEEC add digital, AI, and global delivery capabilities across regulated infrastructure projects.
  • Ranked No. 1 on Zweig's 2026 Hot Firm List, validating its growth platform.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • Flexible Work Hours
  • Paid Parental Leave
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Holidays

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

0%
PR Newswire
Oct 8th, 2026
Verdantas acquires Austin-based Civilitude to expand Texas civil engineering capabilities

Verdantas, a digitally enabled technical consulting firm, has acquired Civilitude Engineers & Planners, an Austin-based civil engineering and planning firm. Founded in 2010, Civilitude specialises in water and wastewater infrastructure, utility coordination, permitting, and land development across Central Texas. The acquisition strengthens Verdantas' presence in Texas and enhances its ability to deliver integrated solutions combining civil engineering with environmental and infrastructure expertise. Civilitude has built strong relationships across public and private sectors, working on projects including affordable housing, educational facilities, and municipal infrastructure. "Civilitude brings exceptional civil engineering and planning expertise, deep knowledge of the Central Texas market and relationships built through years of solving complex challenges," said Jesse Kropelnicki, CEO of Verdantas. The combined organisation will serve clients across Texas's rapidly growing markets. Verdantas employs over 2,800 professionals nationwide.

EIN Presswire
Sep 27th, 2026
Radmantis AI identifies Fish Species mix with 99% accuracy in hydropower study.

Radmantis AI identifies Fish Species mix with 99% accuracy in hydropower study. September 27, 2026, 17:30 GMT U.S. DOE-supported study advances real-time fish monitoring, helping hydropower operators balance clean energy production with healthy river ecosystems. This validation shows that smart underwater imaging can make hydropower structures both more sustainable and responsive to ecosystem needs." - Dr. Robert Huber, CTO, Radmantis TOLEDO, OH, OH, UNITED STATES, September 27, 2026 / EINPresswire.com / - Radmantis, a blue technology company developing intelligent underwater biosecurity monitoring, has successfully completed a hydropower research validation study, reconstructing fish species composition with 99% accuracy while detecting fish with 95.5% reliability (mAP50) under complex, high-density movement conditions. The research validation study was conducted in partnership with the Hydropower Testing Network (HyTN), ENERGYWERX in collaboration with the U.S. Department of Energy's Water Power Technologies Office (WPTO), and Verdantas, a leader in hydraulic engineering and fish passage design. "Hydropower is essential to our renewable energy goals, but maintaining fish passage is critical to preserving aquatic biodiversity," said Dan Giza, Department Lead for Aquatic Resource and Bioengineering at Verdantas Flow Labs. "This collaboration brings new, data-driven tools to better inform fish passage decisions and conservation efforts aimed at protecting endangered species while enabling better management of invasive ones." Hydropower provides dependable, carbon-free electricity, but dams can disrupt river connectivity and affect migratory fish movement between upstream and downstream habitats. Operators must balance energy production with ecological and regulatory requirements related to fish passage, species protection, and aquatic ecosystem management. Radmantis' monitoring platform addresses this challenge by using embedded underwater vision, AI-based inference and industrial automation to detect and classify fish as they move through aquatic environments. The resulting species-level information can support environmental compliance with population assessment, native species preservation, and invasive species control. Verdantas Flow Labs led the two-month validation study at the Alden Campus hydraulics laboratory in Holden, Massachusetts. Researchers used varying combinations of rainbow and brown trout because their similar appearance created a rigorous test of the platform's ability to distinguish individual fish, even when they moved in dense groups. Using a held-out validation set, the platform achieved 95.5% detection performance (mAP50), with 89.8% precision and 90.0% recall. Across 40 single-blind trials, Verdantas knew the actual species composition while Radmantis independently analyzed the underwater video without that information. The platform reconstructed the brown-to-rainbow mix with 99% accuracy, identifying the true composition exactly in 36 of 40 trials and to within 5 fish in the remaining trials. "This validation shows that smart underwater imaging can make hydropower structures both more sustainable and responsive to ecosystem needs," said Dr. Robert Huber, Technology Lead at Radmantis. "By providing clear, continuous insight into fish passage, we're helping operators balance clean energy production with healthy river systems." The ability to identify species within dense, visually complex environments extends beyond fish counting. Because each hydropower site has different species of concern, continuous monitoring can give operators more actionable data to manage native and migratory populations, identify invasive species, and meet environmental requirements. Radmantis is also applying related technology on the Colorado River in support of invasive species control and native fish recovery efforts. With the HyTN validation study complete, Radmantis is seeking partnership opportunities with hydropower operators and research institutions to continue development and field validation across additional species and operating environments. About Radmantis Radmantis is a blue tech company pioneering underwater imaging, embedded vision and automation systems for aquatic monitoring, aquaculture and energy infrastructure. Its technologies deliver real-time analytics to support sustainable operations, ecosystem resilience and environmental compliance in aquatic and marine environments. For more information, visit www. radmantis.com. About Verdantas Verdantas is a leader in digitally enabled technical consulting solutions for the environment, water and energy transition markets. With more than 2,700 professionals nationwide, Verdantas helps clients solve complex environmental and engineering challenges. Its Flow Labs facility is recognized for fish passage design, research and development supporting hydropower and river infrastructure projects. For more information, visit www.verdantas.com. About ENERGYWERX and the Hydropower Testing Network (HyTN) ENERGYWERX administers the Hydropower Testing Network in collaboration with the U.S. Department of Energy's Water Power Technologies Office. The program connects technology developers with leading testing facilities to validate innovative solutions that improve hydropower performance, strengthen environmental stewardship and support a more reliable, resilient electric grid. Media Resources High-resolution images, partner logos, and video are available for editorial use with credit. Species tracking - baseline: Real-time detection and tracking of individual trout moving through the field of view. Species tracking - high-density scene: Tracking individual trout through a dense, visually complex group, tracing each fish's path over time with a visual trail. Credit: Radmantis Inc. Please contact us for additional footage, high-resolution images or interviews. Media Contact: Dr. Moira van Staaden [email protected] +1-419-902-6109 AI Fish Species Identification: Real-Time Trout Tracking - complex | Radmantis Legal Disclaimer: EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above. You just read: September 27, 2026, 17:30 GMT EIN Presswire's priority is author transparency. We do our best to weed out false and misleading content. The content above is the sole responsibility of the author who makes it available. If you have any complaints, kindly contact the author above. Moira van Staaden +1 419-902-6109

PR Newswire
Aug 12th, 2026
Verdantas strengthens environmental capabilities in California with acquisition of Pax Environmental, Inc.

/PRNewswire/ -- Verdantas, a leader in digitally enabled technical consulting solutions for the environment, water, and energy transition markets, today...

PR Newswire
Aug 6th, 2026
Verdantas expands sustainable infrastructure capabilities with acquisition of Sherwood Design Engineers

/PRNewswire/ -- Verdantas, a leader in digitally enabled technical consulting for the environment, water, and energy transition markets, today announced the...

PR Newswire
Jul 30th, 2026
Verdantas acquires Environmental Protection Industries to expand Midwest remediation capabilities

Verdantas, a digitally enabled technical consulting firm, has acquired Environmental Protection Industries (EPI), an environmental consulting and remediation company based in South Holland, Illinois. The acquisition expands Verdantas' presence in the Midwest and strengthens its capabilities in complex remediation and brownfield redevelopment. Founded over 30 years ago, EPI serves clients throughout the Great Lakes region, specialising in environmentally challenged sites in Chicago. The firm has completed more than 100 redevelopment projects using an integrated delivery model that combines remediation, regulatory execution, and site development. EPI's leadership team will continue to lead the business following the transaction. The acquisition aligns with Verdantas' strategy of building an integrated consulting platform across environmental and redevelopment services. Verdantas operates with over 2,600 professionals nationwide and focuses on environment, water, and energy transition markets.