A

Ameren

Provides electric and natural gas utilities

Electrical Repairman - Industrial Electrician

Full-TimeUpdated on 10/23/2026
$52.42/hr
Senior, Expert
West Alton, MO, USA
In PersonLocated at Sioux Energy Center in West Alton, Missouri.
General Maintenance & RepairEquipment Maintenance

About the job

Requirements
  • Have a high school diploma or GED and meet one of these experience pathways: complete a 2-year technical college program and have 3 years of experience working as an industrial electrician; complete a certified apprentice program and have 3 years of experience working as an industrial electrician; or have 10 years of experience working as an industrial electrician.
  • Be able to climb ramps, ladders, and stairs, and work at heights and in confined spaces.
Responsibilities
  • Install, repair, overhaul, and maintain a general range of power plant electrical systems and equipment under direct, indirect, or intermittent supervision while working a rotating shift or day schedule as required.
  • Perform installation, maintenance, repair, and overhaul of generators, voltage regulator rheostats, exciters, buses and bus duct, transformers, circuit breakers, switches, power circuits, magnetic contactors, motors and motor starters, precipitators, batteries, plant lighting, conduit, wiring, boxes, supports, and hangers.
  • Work from schematics, drawings, and sketches.
  • Execute Workman’s Protection Assurance and related procedures to ensure equipment is properly isolated and protected before work.
  • Ensure safety devices are in place and understood before beginning work on energized equipment.
  • Obtain materials from the storeroom, set up rigging, and operate lifting equipment.
  • Erect and work from scaffolds.
  • Operate and use mobile equipment, shop equipment, portable power tools, hand tools, and test equipment.
  • Operate acetylene or other cutting and heating torches, and check for explosive gases before use when necessary.
  • Prepare reports of work performed, including sketches if needed, and complete required forms.
  • Work alone or with employees in Electrical Repairman or Repairman (Mechanic) classifications as assigned.
  • Perform similar and less-skilled work as required.
  • Carry out prescribed safety precautions and safeguards to protect oneself and the team.
  • Ensure the safety of others when working on energized circuits and enforce safety instructions for anyone temporarily under the role’s direction.
  • Perform work without disturbing other equipment and execute orders quickly and properly.
  • Maintain accuracy within required tolerances and specifications, taking care to avoid errors in repair or assembly.
  • Use tools, materials, and equipment properly and dispose of surplus and scrap materials appropriately.
  • Keep work areas clean and orderly to promote good work practices and safety.
  • Collaborate with Dispatchers, Meter and Relay personnel, Plant Operations, Maintenance, and Storeroom supervisors and personnel.

About the company

Ameren provides electric and natural gas services in Illinois and Missouri, with Ameren Illinois handling distribution and Ameren Missouri generating and distributing electricity and distributing gas. It operates a regional electric grid and power generation capacity above 10,200 megawatts to serve about 2.4 million electric customers and 900,000 natural gas customers across 64,000 square miles. It ranks among the largest investor-owned utilities in the United States, distinguished by its large service area, mix of generation and distribution, and Missouri’s vertically integrated electric service. Its goal is to reliably deliver affordable energy while investing in infrastructure and grid safety to meet customers’ needs.

Company Size

5,001-10,000

Company Stage

IPO

Headquarters

St. Louis, Missouri

Founded

1881

Get referred to Ameren

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ameren reaffirmed 2026 EPS guidance of $5.25-$5.45 after Q2 2026 results.
  • September 2026 West Alton filing targets 2.1 GW in-service by 2031.
  • Ameren added 350 MW of solar in 2026 and advanced battery-storage projects.

What critics are saying

  • Missouri PSC can reject West Alton and the 2026 IRP, freezing growth plans.
  • Ameren abandoned net-zero language while adding nine gas plants, inviting activist and legal attacks.
  • Data-center demand drives everything; missed load forecasts strand West Alton, Labadie, and gas pipeline investments.

What makes Ameren unique

  • Missouri and Illinois regulated franchises turn grid buildout into compounding rate base growth.
  • Ameren locked 3.4 GW of Missouri construction agreements, including 2.8 GW signed ESAs.
  • Goalby Substation showed Ameren will deploy GIS to solve hard site constraints.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • 401(k) Company Match
  • Paid Vacation
  • Paid Holidays
  • Parental Leave

Growth & Insights and Company News

6 month growth

-1%

1 year growth

-1%

2 year growth

-1%
Macallan Communications
Oct 23rd, 2026
Missouri PSC approves Ameren Missouri battery storage, solar projects.

Missouri PSC approves Ameren Missouri battery storage, solar projects. The Missouri Public Service Commission (PSC) on Oct. 21 approved Ameren Missouri's plans to build three battery energy storage facilities, acquire two solar developments, and construct a new switching station to connect a battery storage project to the transmission system. The projects are intended to support electric grid reliability and provide energy during periods of high demand, including extreme heat and cold. The PSC's approval includes an agreement among Ameren Missouri, PSC Staff, and Renew Missouri. The Office of the Public Counsel (OPC), which represents the public in cases before the commission, was not a signatory but did not object to the agreement. "Deploying these projects now helps prepare the grid for how our customers will use energy in the years ahead," said Ajay Arora, executive vice president and chief growth and generation development officer for Ameren Missouri. "Battery storage can respond within moments to changing grid conditions and provide additional energy when demand is highest." The approved projects include three battery energy storage systems (BESS): * Castle Bluff: A 95-megawatt (MW) battery storage facility in St. Louis County at the retired Meramec coal-fired facility, co-located at the Castle Bluff Energy Center, which is under construction. The project has a targeted in-service date of 2028. * Huck Finn: A 200-MW battery storage facility at Ameren Missouri's Audrain Energy Center in Audrain County, with a targeted in-service date of 2028. * Millcreek: A 250-MW battery storage facility in Lincoln County, targeted to enter service in 2028. The PSC's approval also includes the Quinn Switching Station, a new 161-kilovolt switching station in Lincoln County that will connect the Millcreek battery storage facility to the existing transmission system. Two solar developments are also part of the agreement: * Ringer: A 225-MW solar facility in Stoddard County that Ameren Missouri will acquire from Invenergy. Targeted to enter service in 2029, the facility is expected to produce enough energy to power more than 40,000 homes annually. * Tom Sawyer: A 175-MW solar facility in Audrain County that Ameren Missouri will acquire from EDF power solutions. It has a targeted in-service date of 2028 and is expected to produce enough energy to power more than 31,500 homes annually. The PSC said its decision considered safety and cost protections for Ameren Missouri customers while balancing the interests of landowners near the projects. Under the agreement, Ameren Missouri must address safety, environmental protection, construction oversight and cost reporting for the battery storage facilities. The company said it will work to expand information addressing community concerns about the Millcreek project, including fire safety, battery testing and nearby infrastructure. Ameren Missouri also must submit site-specific hazard mitigation analyses or plans for each battery facility after it enters service, along with information on emergency response procedures, environmental mitigation and containment practices related to fire response, according to the commission. The company must provide documentation of state, federal, and local permits obtained for each battery project and address safety testing before battery installation, including compliance with National Fire Protection Association (NFPA) 855 standards for stationary energy storage systems. The agreement also requires Ameren Missouri to notify the commission if a project's total costs change by more than 15 percent of the applicable base or risk-adjusted project costs, explain the reasons for the increase, and describe efforts to mitigate the cost, the PSC said. Additionally, the company must submit quarterly progress reports covering construction milestones, permitting, costs, delays, and potential impacts from legislative or executive actions. For the Millcreek project, Ameren Missouri must meet with OPC and PSC Staff to discuss the results of Tesla Megapack 3 safety testing and steps taken by the supplier to ensure compliance with NFPA 855. At least 90 days before batteries are installed at the Millcreek site, Ameren Missouri must file a public pleading confirming completion of the testing, identifying the results and attaching the supplier's confidential safety testing report for Staff and OPC review. The PSC review included input from residents, local officials, and other stakeholders. "We appreciate the participation of community members and stakeholders throughout the review process, and we're focused on delivering projects that support safe and reliable service for our customers," said Rob Dixon, vice president of regulatory, legislative and external affairs for Ameren Missouri.

St. Louis Post-Dispatch
Oct 21st, 2026
Missouri greenlights Lincoln County battery storage project. Residents are angry.

Missouri greenlights Lincoln County battery storage project. Residents are angry. Ameren Missouri officials said they chose a site in rural Lincoln County to build a lithium ion battery energy storage system and a potential solar farm because the site was close to existing high-powered transmission lines, pictured here on August 2, 2026. The energy storage proposal is pending state regulator approval, while Ameren has yet to submit paperwork for the solar farm. * Ethan Colbert | Post-Dispatch Residents in Eolia and nearby communities in northern Lincoln County are upset by a proposal from Ameren Missouri to build a battery energy storage site and a potential 1,100-acre solar farm nearby. The project has pitted rural farmers against environmentalists in St. Louis who are advocating for Ameren's renewable energy project. * Ethan Colbert | Post-Dispatch A high-tech energy storage project slated for rural northern Lincoln County was approved Wednesday by state utility regulators despite concerns from nearby residents. The 4-0 vote from members of the Missouri Public Service Commission paves the way for Ameren Corp.'s push to build a 250-megawatt battery farm on 12 acres near the village of Eolia. Once built, the site will store energy generated elsewhere and then release it as demand requires. "Deploying these projects now helps prepare the grid for how our customers will use energy in the years ahead," Ajay Arora, Ameren's executive vice president, said Wednesday in a statement. People are also reading... Resident reaction after the ruling ranged from anger to resignation. Andrea Young, who lives near the proposed site, chastised the commissioners for attending a public hearing via video feed this summer in Eolia, which sits along the Lincoln and Pike county line, 75 miles north of St. Louis. "They didn't even care to show up in person," Young said on Wednesday. "And I don't believe for a minute that they could even find Eolia on a map. So I don't think we were heard at all." Ameren pitched the project, dubbed "Millcreek Energy Center," in July. Once built, it would be capable of powering about 180,000 homes for four hours, according to the St. Louis-based electric monopoly. Opposition to the Lincoln County project was vocal and swift. Neighbors and farmers organized town halls, urged their county commissioners to intervene and filed dozens of letters with the Public Service Commission. And they asked pointed questions of Ameren and the PSC about costs, land use, fire risks and potential data center development - despite Ameren's assurances that data centers aren't part of the plan. PSC commissioners said Wednesday they were satisfied by the way public concerns were addressed. "There was a lot of misinformation" at public hearings, said PSC chair Kayla Hahn. Commissioner John Mitchell called the concerns "intensely local issues." "And although the commission is approving the concept, the local governments still have both the authority and the obligation to impose additional requirements," he said. On Wednesday, Eolia-area residents disagreed. Joe Gray, a mechanical engineer who lives a few miles from the proposed battery farm, said Ameren's response to the community's concerns about fire risks was "questionable at best." He said many in the community are concerned how the region's all-volunteer fire department would respond to a potential fire at the battery farm. He said Ameren officials have told the community their goal would be to keep the fire from spreading to the other batteries, which are housed in shipping container-like structures. He said Ameren's pledges to train local firefighters and to build a water tower on-site didn't sway him. "We've got people who are doing their dog-gone best to learn as much as they possibly can and as fast as they can," Gray said. "It shouldn't be up to us to get educated on this. It should be up to Ameren to present credible and accurate information to the neighbors." Gray said he and others began to distrust Ameren's proposal when officials admitted that existing natural gas generation sites in nearby Bowling Green and Vandalia are only used a few days out of the year. Kenzie Aubuchon, a sixth-generation farmer, said while Ameren touts this project as a win for Missourians she sees it very differently. "The only winner here is Ameren," Aubuchon said. "The public did not win. Lincoln County did not win." Get the latest local business news delivered FREE to your inbox weekly. Energy and environment St. Charles County reporter Related to this story. "Data centers should pay for their own cost of service," said John Clizer, a lawyer for the Office of Public Counsel.

KBSI FOX 23
Oct 13th, 2026
Cape Girardeau Ameren lineworkers to compete in international competition.

Cape Girardeau Ameren lineworkers to compete in international competition. FOX23 News at 9 p.m. 4 hours ago CAPE GIRARDEAU, Mo., (KBSI) - Ameren lineworkers from Missouri and Illinois are preparing to compete against utility workers from around the world at the 42nd International Lineman's Rodeo in Overland Park, Kansas. The competition, scheduled for Oct. 14-17, brings together lineworkers and apprentices to demonstrate their technical skills, teamwork and safety practices. Ameren Missouri will send four journeyman teams, 10 apprentices and nine competition officials and committee members. Among those competing are three lineworkers from Ameren's Cape Girardeau Operating Center: Kolter McBride, Brendan Wilkens and Joshua Jones. Ameren Illinois will send five journeyman teams, four apprentices and six competition officials and committee members. Participants include workers from Belleville, Marion, Centralia, Decatur and other operating centers across the state. The competition, often called the "Lineman Olympics," features events designed to simulate real-world situations utility workers face on the job. Events include the Hurtman Rescue, which tests a worker's ability to rescue an injured colleague from a utility pole, and the Pole Climb, a timed event that evaluates climbing techniques and safety procedures. Competitors will also participate in two mystery events that simulate unexpected situations in the field. Apprentices must complete a written examination in addition to the hands-on challenges. Participants are evaluated on safety, job knowledge, work practices and overall performance. "The work our lineworkers and apprentices perform is essential to delivering safe and reliable energy to our customers," said Landy Wince, senior director of division operations at Ameren Missouri. "This event highlights the professionalism, training and dedication that define their craft and allows them to showcase those skills on an international stage." Jason Klein, vice president of electric operations at Ameren Illinois, said the competition also gives workers an opportunity to learn from others in the industry. "The Lineman's Rodeo is a chance for our lineworkers and apprentices to showcase the skills they use every day to keep the lights on for our customers," Klein said. The event also allows families to see firsthand the skills and safety practices lineworkers use in their daily work.

PR Newswire
Oct 13th, 2026
Arevon secures three 20-year Renewable Energy Credit contracts for its 200 megawatt Panther Energy Project in Illinois.

Arevon secures three 20-year Renewable Energy Credit contracts for its 200 megawatt Panther Energy Project in Illinois. Oct 13, 2026, 08:00 ET Agreements with Ameren Illinois, ComEd, and MidAmerican advance the Perry County solar project and the state's energy goals PERRY COUNTY, Ill. and SCOTTSDALE, Ariz., Oct. 13, 2026/PRNewswire/ - Arevon Energy, Inc., a leading American energy developer, owner, and operator, today announced it has executed three 20-year Indexed Renewable Energy Credit (REC) contracts with Ameren Illinois Company (Ameren Illinois), Commonwealth Edison Company (ComEd), and MidAmerican Energy Company (MidAmerican) for its 200 megawatt (MWac)/275 megawatt (MWdc) Panther Energy Project in Perry County, Illinois. The Panther Energy Project is anticipated to begin construction in 2027 and reach completion in 2028, creating an estimated 200 construction jobs. The project is expected to contribute an estimated $20 million in property tax payments over its operating life, benefiting area schools, infrastructure, and other public services while driving additional economic activity. Arevon has established a local office in Pinckneyville, providing landowners, residents, and other community members with direct access to the Panther project team during development and upcoming construction. Once operational, the project is expected to generate enough electricity to power more than 37,000 Illinois homes. The long-term commercial agreements follow Panther Energy's selection in the Illinois Power Agency's (IPA) Summer 2026 Indexed REC procurement, which was approved by the Illinois Commerce Commission (ICC). Under the IPA's procurement methodology, Panther Energy was selected to deliver 421,131 RECs in the first year, which will be allocated among Ameren Illinois, ComEd, and MidAmerican through separate long-term contracts with each utility. The Indexed REC structure provides long-term revenue certainty that supports the development and financing of new renewable energy projects. The RECs acquired by the utilities will help meet their obligations under the Illinois Renewable Portfolio Standard. The Summer 2026 procurement was conducted pursuant to Illinois's Climate and Equitable Jobs Act (CEJA), which became law in 2021 and established the Indexed REC pricing structure for utility-scale renewable energy procurements. In total, the ICC approved contracts for 1.55 gigawatts of new renewable energy capacity, including four utility-scale solar projects totaling 740 MWac, through the Summer 2026 procurement. "Arevon is proud to work with Ameren Illinois, ComEd, and MidAmerican through the IPA procurement to move Panther Energy closer to construction and contribute to Illinois's energy goals," said Tommy Greer, Chief Commercial Officer at Arevon. "We appreciate the collaboration of Perry County residents, landowners, and local officials throughout the project's development. We look forward to delivering reliable, homegrown energy to the grid while creating jobs, generating long-term economic benefits, and investing in the local community." Arevon is actively growing its portfolio in the Midwest region of the United States through the operations, construction, and continued development of energy facilities. Recent milestones in the Midwest include the start of operations at its 430 MWdc Kelso Solar Project in Missouri and Ratts 1 and Heirloom Solar Projects in Indiana, which have a cumulative capacity of 264 MWdc. Ratts 1 and Heirloom were awarded the 2025 Proximo North America Solar Deal of the Year. The company has also nearly completed construction on its 124 MWdc Big Muddy Solar Project in Jackson County, Illinois. In addition, Arevon developed and managed construction of the 251 MWdc Gibson Solar Project and the 228 MWdc Posey Solar Project in Indiana on behalf of local utilities. About Arevon Energy, Inc. Arevon is a U.S. energy leader committed to powering America with affordable, reliable, and secure homegrown energy. Headquartered in Scottsdale, Arizona, and with a regional office in New York City, the company's experienced and dedicated team develops, finances, builds, owns, and operates renewable energy projects nationwide. With a strong track record in utility-scale solar and energy storage, Arevon is a trusted partner to utilities and businesses seeking cost-effective, sustainable energy solutions. By prioritizing American manufacturing and domestic energy production, the company invests in U.S. jobs, strengthens local economies, and advances the country's energy independence. Arevon owns and operates more than 6.3 gigawatts of solar and energy storage projects across 18 states, is currently constructing 370 megawatts (MW) of new capacity, and maintains a robust development portfolio. The company has also partnered with local utilities to develop and build 480 MW of solar energy, ensuring each project was successfully integrated into their communities. Together, this scale, execution, and ongoing development activity position Arevon at the forefront of American energy innovation. For more information, visit arevonenergy.com. SOURCE Arevon

MarketScreener
Oct 8th, 2026
Ameren: Transmission partnership to leave lasting land improvements at NEMO Fairgrounds.

Ameren: Transmission partnership to leave lasting land improvements at NEMO Fairgrounds. Published on 10/08/2026 at 12:07 pm EDT Ameren Transmission partnership to leave lasting land improvements at NEMO Fairgrounds Key Takeaways: * Ameren Transmission Company of Illinois (ATXI) reached an agreement with the NEMO Fair Association to establish a temporary storage yard to hold supplies for a major transmission project in northern Missouri. * Once the transmission project is complete, the NEMO Fair Association will benefit from approximately 35 acres of upgraded, level ground that can be used for additional parking, storage or other future needs. * Construction on the laydown yard began in August 2026, and it is expected to be completed by the end of the year. Above: Ameren Transmission will provide 35 acres of upgraded, level ground for the NEMO Fair Association to use for additional parking, storage or other future needs. KIRKSVILLE, Mo. (Oct. 8, 2026) - Ameren Transmission Company of Illinois (ATXI) recently reached an agreement with the NEMO Fair Association to establish a laydown yard to store equipment and materials for Ameren's Northern Missouri Grid Transformation Program. Once the transmission project is complete, the NEMO Fair Association will benefit from approximately 35 acres of upgraded, level ground that can be used for additional parking, storage or other future needs. "This partnership is a win-win for ATXI and the NEMO Fair," said Nick Rudis, project manager for Ameren. "Major infrastructure projects require space to safely store materials and equipment. By partnering with the NEMO Fair Association, we're able to strengthen the grid and support this region's future energy needs while also leaving behind improvements that can support the fairgrounds for years to come." Workers are leveling the land, adding rock and installing fencing as part of site improvements. Construction of the laydown yard is expected to be completed by the end of the year, and ATXI has signed a four-year lease agreement to use the land. "We're always on the lookout for opportunities that help us improve the fairgrounds and better serve the community," said Alan Whittom, president of the NEMO Fair Association's board of directors. "We look forward to using the additional space. It will give us flexibility to support activities and events long after the project is completed." After construction is finished, the laydown yard will hold supplies for the Northern Missouri Grid Transformation Program. ATXI, Missouri Joint Municipal Electric Utility Commission (MJMEUC) and Ameren Missouri are working together on this portfolio of new energy projects. The program includes more than 255 miles of new 345 kilovolt (kV) transmission lines developed in two phases across northern Missouri. To learn more about the program, visit the website: https://www.ameren.com/reliability/transmission/northern-missouri. About Ameren Corporation St. Louis-based Ameren Corporation powers the quality of life for 2.5 million electric customers and more than 900,000 natural gas customers in a 67,700-square-mile area through its Ameren Missouri and Ameren Illinois rate-regulated utility subsidiaries. Ameren Illinois provides electric transmission and distribution service and natural gas distribution service. Ameren Missouri provides electric generation, transmission and distribution services, as well as natural gas distribution service. Ameren Transmission Company of Illinois develops, owns and operates rate-regulated regional electric transmission projects in the Midcontinent Independent System Operator, Inc. For more information, visit Ameren.com, or follow us at @AmerenCorp, Facebook.com/AmerenCorp, or LinkedIn.com/company/Ameren. Attachments * Original document * Permalink Disclaimer Ameren Corporation published this content on October 08, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 08, 2026 at 16:06 UTC. (C) Publicnow - 2026