C

Crusoe

Builds AI data centers near cheap energy

Senior Staff Project Manager - Spark

Full-TimeUpdated on 10/27/2026
$190k - $215k
Senior
Bachelor of Science (BS)
Brighton, CO, USA
In Person
Project & Program ManagementProject Management

About the job

Requirements
  • A minimum of 7 years of experience managing projects within the electrical equipment, construction, engineering, and/or manufacturing industry.
  • Experience in construction or a similar industry with exposure to multidisciplinary products, including electrical, HVAC, structural, and enclosure/building-envelope systems.
  • Competence in building and electrical codes to collaborate with in-house engineering, manufacturing technicians, and authorities having jurisdiction for permit processing.
  • Ability to interpret electrical and structural engineering design drawings, review engineering drawings, assess design aspects, and advise on risks from a buildability perspective.
  • A Bachelor of Science in Business, Engineering, or Construction Management; closely related fields will be considered.
  • Proven ability to lock scope, manage change orders, and lead adoption of dynamic change-management practices across engineering, manufacturing, and procurement teams.
  • Proficiency in scheduling using waterfall and agile methodologies, with tools such as Smartsheet, Microsoft Project, Monday.com, or Primavera P6.
  • Ability to forecast and create a cost budget and manage it through project completion.
  • Demonstrated ability to foster teamwork and influence peers for collaborative project execution.
  • Proficiency in Google Suite and Microsoft Office for project documentation and communication.
  • Experience with manufacturing enterprise resource planning systems such as SAP or Visual.
  • The position is safety-sensitive and requires participation in the drug and alcohol program.
Responsibilities
  • Plan, organize, and execute Engineered to Order modular data center building projects, converting customer requirements into actionable scope in collaboration with engineering and manufacturing experts.
  • Collaborate with technical customer representatives, engineering, and manufacturing teams on modular data center design.
  • Define project goals, develop plans and financial budgets, and manage timelines to deliver projects on time and within budget from concept engineering through delivery to site.
  • Coordinate with estimating, engineering, procurement, production, and accounting teams to align deliverables and mitigate risk.
  • Develop customer relationships, manage change, hold stakeholders accountable, control scope, explain decision impacts, and resolve customer problems.
  • Own project estimate-versus-actual costs, track production against quoted costs, maintain compliance with cost baselines, and surface cost drift.
  • Ensure every engineering change order and engineering change notice is costed and recovered.
  • Break complex projects into financial budgets and reports, maintain accurate project cost models to PMO reporting standards and cadence, and sign the monthly cost-to-complete position for program economics review.
  • Identify and mitigate scope creep, project risks, and design changes; manage risk and action logs, requests for information, submittals, and change orders to align stakeholders and maintain budgets and schedules.
  • Partner with Quality leaders to execute the Inspection and Test Plan on time and to applicable standards and specifications.
  • Guide and support team members, clarify tasks, and lead within and outside the direct team.
  • Identify and allocate internal and external resources needed for project success.
  • Surface facility process friction and work with process owners on continuous improvement.
  • Track licensing requirements by authority having jurisdiction in collaboration with the licensing team, and ensure compliance with modular-building manufacturing permit requirements across jurisdictions.
  • Complete project-level executive dashboard inputs on schedule, milestones, cost, margin, and open risks, ensuring accuracy and timeliness.
Desired Qualifications
  • Experience with modular building manufacturing and/or data center construction.
  • Direct expertise managing change on first-of-a-kind manufacturing programs or highly complex projects while maintaining positive client relationships through significant project evolution.
  • Project Management Professional or Certified Associate in Project Management certification.
  • Experience with advanced project management methodologies.
  • Advanced knowledge of manufacturing processes.
  • Familiarity with industrialized building programs such as Texas TDLR/IHB and third-party inspection agency workflows.
  • Working understanding of profit and loss, cost control, and cost structure.
  • Supply chain experience, including long-lead procurement, supplier management, and material risk.
  • Experience with Acumatica.

About the company

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company Size

1,001-5,000

Company Stage

Debt Financing

Total Funding

$14.5B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Room to grow: Crusoe listed 358 open roles in October 2026, from cloud engineering to factory work.
  • Equity has a path to cash: Crusoe was meeting IPO banks, including Goldman Sachs and JPMorgan, in August 2026.
  • Steady work ahead: Crusoe reported over $140 billion in signed customer contracts in September 2026.

What critics are saying

  • Projects aren't safe until built: Google asked Crusoe to leave a 1.8-gigawatt Wyoming campus, then took over in July 2026.
  • The hard part is ahead: only 1 of the 6-plus gigawatts Crusoe had signed was running in September 2026.
  • Less upside for new hires: Crusoe's valuation hit $30.9 billion in September 2026, triple its October 2025 level.

What makes Crusoe unique

  • It makes its own electrical gear instead of waiting on suppliers: two Tulsa factories have built over 2,500 switchboards.
  • Its own MemoryAlloy software lets GPUs share memory, so AI answers start up to 9.9 times faster in Crusoe's tests.
  • Its power-ready land is in demand: Microsoft leased 900 megawatts at Abilene in March 2026 after OpenAI and Oracle passed.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Industry competitive pay
  • Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents
  • Paid life insurance, short-term and long-term disability
  • Parental leave
  • Stock options in a fast-growing, well-funded technology company
  • Pet-friendly offices
  • Teladoc
  • 401(k) with a 4% match
  • Unlimited time off
  • Cell phone reimbursement
  • Tuition reimbursement
  • Company paid commuter benefit; $100 per month

Growth & Insights and Company News

6 month growth

2%

1 year growth

3%

2 year growth

2%
Yahoo Finance
Oct 22nd, 2026
Neoclouds explained: GPU providers behind the AI boom face a $3.5T impairment risk

Neoclouds, specialist providers that rent out GPU capacity for AI training and inference, have gone from unknown startups to listed companies with contracts worth billions of dollars. CoreWeave, Nebius and IREN lead the listed group; Lambda, Crusoe and Fluidstack remain private. Their shares fell hard in October 2026. CoreWeave dropped 29%, leaving it valued at about $34 billion against a 2025 peak of about $90 billion; Nebius fell 27% and IREN 32%. CoreWeave's unsecured debt yielded about 15%. On October 14, 2026, Gartner predicted that more than 80% of neocloud providers will stop operating independently by 2030. It also warned that more than $3.5 trillion of AI infrastructure spending could face impairment. Demand remains strong. CoreWeave co-founder Brannin McBee said nearly all of its 2027 capacity is sold.

Associated Press
Oct 21st, 2026
Crusoe backs NVIDIA DSX POD with Spark modular AI platform, 352,000 sq ft factory

Crusoe said its Crusoe Spark modular AI data centre platform will support NVIDIA's new DSX POD reference design, a blueprint for modular infrastructure built on the NVIDIA Vera Rubin Platform. The company announced the move in Denver on October 21, 2026. Crusoe has built modular data centres since 2020. It will mass produce Spark units at its 352,000-square-foot factory in Brighton, Colorado, and it unveiled Crusoe Spark Liquid, its sixth-generation unit designed for dense systems such as Vera Rubin NVL72. Crusoe says it can deliver AI capacity in as little as three months. Customers can use Vera Rubin capacity through Crusoe Cloud, deploy dedicated units via Crusoe Edge Zones, or add modular capacity to existing sites. "Modular isn't a new strategy or pivot for us," said Bryan Schramm, head of Spark.

Yahoo Finance
Sep 23rd, 2026
Thinking Machines Lab signs $65M deal with Crusoe for AI inference infrastructure

Crusoe, a vertically integrated AI infrastructure provider, has signed a $65 million annual agreement with Thinking Machines Lab to power inference for the lab's open models on Crusoe Cloud. Through Crusoe Managed Inference, Thinking Machines Lab will serve production workloads including its Inkling models, GLM 5.2 and 5.3, on NVIDIA HGX B200 systems connected with NVIDIA Quantum-2 InfiniBand networking. The service enables Thinking Machines Lab to scale without managing its own inference stack. The companies plan to expand into batch inference for large-scale synthetic data generation. Thinking Machines Lab joins other clients that have taken Crusoe Managed Inference past $100 million in contracted annual recurring revenue less than a year from launch.

The Wall Street Journal
Sep 17th, 2026
The Startup That Built OpenAI’s Biggest Data Center Is Now Making Tiny Ones

Crusoe raised $3.9 billion at a valuation of nearly $31 billion, as it bets on factory-built data centers.

Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.