A

Ambrosia Energy

Builds and operates off-grid solar+battery plants

Power Electronics Test Engineer

Power Systems EngineeringConfirmed live in the last 24 hours
Full-timeNo salary listedIn-person

About the Job

Requirements

  • A bachelor's degree in Electrical Engineering, Power Electronics, or a related field is required.
  • At least 1 year of experience in power electronics development and testing is required.
  • A proficient understanding of power electronics fundamentals is required.
  • The role requires understanding power electronics conversion and control.
  • The role requires root-cause analysis of hardware bugs, power component failures, and control anomalies during prototyping and test cycles.
  • The role requires the ability to develop functional test benches and automated verification tests for power electronics conversion systems.
  • The role requires technical writing and communication skills to convey complex concepts clearly.

Responsibilities

  • Design, execute, and document verification and validation test plans for distributed battery storage systems, DC-DC converters, AC-DC stages, and solar maximum power point tracking (MPPT) power hardware.
  • Review schematics and printed circuit board layouts to assess testability.
  • Use oscilloscopes, logic analyzers, power analyzers, electronic loads, differential probes, and programmable power supplies to perform high-power testing safely.

Desired Qualifications

  • A minimum of 3 years of experience in power electronics converter development is preferred.
  • Knowledge of industrial environmental reliability standards is preferred.
  • Hands-on experience debugging and validating embedded and electrical systems using oscilloscopes, logic analyzers, debuggers, and similar tools is preferred.

About the Company

Ambrosia Energy

Builds and operates off-grid solar+battery plants

Ambrosia Energy builds, owns, and operates solar-plus-battery plants that deliver continuous off-grid power. It offers two options: co-located plants on its West Texas land or plants built on a customer site, using a complete solar-plus-storage system designed for a 99.9% capacity factor. The company controls land, permitting, battery manufacturing, and operations to eliminate middlemen and shorten timelines, using proven LFP batteries and a fast-installation method. Its goal is to provide reliable, large-scale power at about $100 per MWh, making it a practical alternative to natural gas for data centers and industrial customers while targeting rapid deployment within roughly 12 months from contract.

Company size
11-50
Company stage
Not listed
Total funding
Not listed
Headquarters
Not listed
Founded
2025

Recently Posted Jobs

Explore more opportunities at Ambrosia Energy

See more jobs