C

Crusoe

Builds AI data centers near cheap energy

Software Engineer Intern

Summer 2027Posted on 10/22/2026
$49/hr+ One-time housing stipend + Commuter allowance
Internship
Bachelor's, Master's
San Francisco, CA, USA
In PersonThe 12-week internship program is in person.
Software EngineeringBackend Engineering
No H1B Sponsorship

About the job

Requirements
  • You are currently pursuing a Bachelor's or Master's degree in Computer Science, Engineering, or a related field.
  • You are familiar with coding in a language such as Python, Java, C++, JavaScript, Rust, or Go.
  • You are familiar with computer science fundamentals, including data structures and algorithm design.
Responsibilities
  • Build and maintain scalable, highly available, fault-tolerant distributed systems.
  • Build products and tools from the ground up for customers around the world.
  • Triage bugs and solve issues in production.
  • Work with product owners and other stakeholders to iterate on new features.
  • Work in one of three organizations, depending on interest and business needs: Managed Cloud, Cloud Availability, or Cloud Infrastructure.
  • For Managed Cloud, build features for Crusoe Cloud's customer-facing UI, command-line tool, and APIs.
  • For Cloud Availability, build tools to automatically detect and fix problems across GPU infrastructure, replacing manual work.
  • For Cloud Infrastructure, build the compute, storage, and networking layer that supports the cloud, including Kubernetes controllers and operators.
Desired Qualifications
  • Preferably graduating between Fall 2027 and Spring 2028.
  • In Managed Cloud, interest in full-stack or backend web development and Go or TypeScript/React.
  • In Cloud Availability, interest in automation, scripting, and investigating system failures, with Go and Python.
  • In Cloud Infrastructure, interest in operating systems, distributed systems, or Kubernetes, with Go.

About the company

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$13.8B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Room to grow: Crusoe listed 358 open roles in October 2026, from cloud engineering to factory work.
  • Equity has a path to cash: Crusoe was meeting IPO banks, including Goldman Sachs and JPMorgan, in August 2026.
  • Steady work ahead: Crusoe reported over $140 billion in signed customer contracts in September 2026.

What critics are saying

  • Projects aren't safe until built: Google asked Crusoe to leave a 1.8-gigawatt Wyoming campus, then took over in July 2026.
  • The hard part is ahead: only 1 of the 6-plus gigawatts Crusoe had signed was running in September 2026.
  • Less upside for new hires: Crusoe's valuation hit $30.9 billion in September 2026, triple its October 2025 level.

What makes Crusoe unique

  • It makes its own electrical gear instead of waiting on suppliers: two Tulsa factories have built over 2,500 switchboards.
  • Its own MemoryAlloy software lets GPUs share memory, so AI answers start up to 9.9 times faster in Crusoe's tests.
  • Its power-ready land is in demand: Microsoft leased 900 megawatts at Abilene in March 2026 after OpenAI and Oracle passed.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Industry competitive pay
  • Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents
  • Paid life insurance, short-term and long-term disability
  • Parental leave
  • Stock options in a fast-growing, well-funded technology company
  • Pet-friendly offices
  • Teladoc
  • 401(k) with a 4% match
  • Unlimited time off
  • Cell phone reimbursement
  • Tuition reimbursement
  • Company paid commuter benefit; $100 per month

Growth & Insights and Company News

Headcount

6 month growth

2%

1 year growth

2%

2 year growth

2%
Associated Press
Oct 21st, 2026
Crusoe backs NVIDIA DSX POD with Spark modular AI platform, 352,000 sq ft factory

Crusoe said its Crusoe Spark modular AI data centre platform will support NVIDIA's new DSX POD reference design, a blueprint for modular infrastructure built on the NVIDIA Vera Rubin Platform. The company announced the move in Denver on October 21, 2026. Crusoe has built modular data centres since 2020. It will mass produce Spark units at its 352,000-square-foot factory in Brighton, Colorado, and it unveiled Crusoe Spark Liquid, its sixth-generation unit designed for dense systems such as Vera Rubin NVL72. Crusoe says it can deliver AI capacity in as little as three months. Customers can use Vera Rubin capacity through Crusoe Cloud, deploy dedicated units via Crusoe Edge Zones, or add modular capacity to existing sites. "Modular isn't a new strategy or pivot for us," said Bryan Schramm, head of Spark.

Yahoo Finance
Sep 23rd, 2026
Thinking Machines Lab signs $65M deal with Crusoe for AI inference infrastructure

Crusoe, a vertically integrated AI infrastructure provider, has signed a $65 million annual agreement with Thinking Machines Lab to power inference for the lab's open models on Crusoe Cloud. Through Crusoe Managed Inference, Thinking Machines Lab will serve production workloads including its Inkling models, GLM 5.2 and 5.3, on NVIDIA HGX B200 systems connected with NVIDIA Quantum-2 InfiniBand networking. The service enables Thinking Machines Lab to scale without managing its own inference stack. The companies plan to expand into batch inference for large-scale synthetic data generation. Thinking Machines Lab joins other clients that have taken Crusoe Managed Inference past $100 million in contracted annual recurring revenue less than a year from launch.

The Wall Street Journal
Sep 17th, 2026
The Startup That Built OpenAI’s Biggest Data Center Is Now Making Tiny Ones

Crusoe raised $3.9 billion at a valuation of nearly $31 billion, as it bets on factory-built data centers.

Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.

Yahoo Finance
Sep 14th, 2026
Crusoe opens second Tulsa facility, doubles workforce to 300 for AI infrastructure manufacturing

Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.

INACTIVE