Requirements
  • A bachelor's degree in Information Technology, Computer Science, Engineering, or a related field is required; a master's degree is a plus.
  • At least five years of experience in data centre operations, focused on capacity planning and integration.
  • Proven project management experience; Project Management Professional (PMP) or PRINCE2 certifications are preferred.
  • Strong understanding of data centre infrastructure, including servers, networking, storage, and cooling systems.
  • Verbal and written communication skills sufficient to explain complex technical concepts to diverse audiences.
  • Analytical and problem-solving skills, with a proactive approach to identifying and resolving issues.
  • Ability to collaborate in a team environment and manage multiple stakeholders.
  • High attention to detail and commitment to delivering high-quality work.
Responsibilities
  • Lead and manage end-to-end integration projects for new data centre capacity, ensuring delivery on time, within budget, and to required quality standards.
  • Collaborate with the capacity planning team to understand future capacity requirements and ensure smooth integration of new infrastructure.
  • Coordinate with internal and external stakeholders, including design, construction, and operations teams, to ensure seamless integration of new capacity.
  • Develop and execute operational readiness plans, including testing, documentation, and training, so new capacity is fully operational upon integration.
  • Implement and maintain quality assurance processes to ensure all new capacity meets company standards and regulatory requirements.
  • Identify potential risks and develop mitigation strategies to minimise their impact on operations.
  • Provide regular updates and reports on project status, risks, and issues to senior management and stakeholders.
Desired Qualifications
  • A master's degree is a plus.
  • Project management certifications such as PMP or PRINCE2 are preferred.

About the company

DayOne Data Centers designs and operates next-generation digital infrastructure, providing colocation and customized data center solutions for hyperscalers and large enterprises. Its rapid modular deployment uses prefabricated components and the SIJORI data corridor to deliver low-latency, scalable capacity, such as a Johor greenfield project completed in about 8.5 months. The facilities use high-efficiency liquid cooling and intelligent infrastructure management, with renewable-ready designs and low-carbon construction, including solid oxide fuel cells in Singapore. With roughly 480MW in service or under construction and 590MW planned across Asia-Pacific and Europe, DayOne aims to support high-performance computing, cloud, and AI workloads while expanding its regional footprint with strong funding from large investors.

Company Size

1,001-5,000

Company Stage

Debt Financing

Total Funding

$14.3B

Headquarters

Singapore, Singapore

Founded

2022

Get referred to DayOne Data Centers

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 1, 2026 TNB partnership unlocked on-site power planning for DayOne’s Malaysia expansion.
  • August 18, 2026 S$530 million Singapore green loan funds its first domestic campus.
  • August 20, 2026 Sepang land acquisition and RM28 billion Malaysia target deepen regional scale.

What critics are saying

  • DayOne’s 1.5GW Selangor plan depends on feasibility studies, approvals, and TNB negotiations.
  • Confidential August 11 IPO plans and $7 billion debt expansion expose execution to markets.
  • STT GDC, Equinix, and hyperscaler self-builds squeeze pricing while Singapore power restrictions constrain growth.

What makes DayOne Data Centers unique

  • SIJORI links Singapore connectivity, Johor costs, and Batam expansion for regional latency advantages.
  • DayOne ships modular campuses fast; Johor delivered in 8.5 months.
  • Hydrogen-ready SOFC cooling and liquid-cooling design target AI workloads, not legacy colocation.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Training Programs

Growth & Insights and Company News

Headcount

6 month growth

18%

1 year growth

16%

2 year growth

20%
BizTech Weekly
Oct 7th, 2026
DayOne Data Centers files for U.S. IPO, putting AI infrastructure economics on display.

DayOne Data Centers files for U.S. IPO, putting AI infrastructure economics on display. DayOne Data Centers Limited on Oct. 5 filed a preliminary Form F-1 registration statement for a U.S. IPO, offering public investors one of the clearest operating snapshots yet of the AI data-center buildout outside the United States and China. The Singapore-headquartered company says it expects to list American depositary shares on Nasdaq under the symbol DODC, though the filing leaves the number of shares, price range and deal size blank. What matters immediately is not the unfinished offering but the operating evidence inside it. DayOne reported $512.024 million in revenue for the six months ended June 30, up from $151.500 million a year earlier, alongside a net loss that widened to $77.209 million from $12.573 million. As of Sept. 20, it listed 2,281 megawatts of customer bookings, 953 MW of billings, 1,328 MW of backlog, 962 MW of capacity in service and 1,328 MW under construction. For investors, cloud buyers, utilities and equipment suppliers, the prospectus turns the AI-infrastructure boom into a more answerable question: is this becoming a durable operating business, or is much of the value still trapped in a capital-intensive pipeline? The delivery ladder behind the gigawatts. DayOne's filing is useful because it separates terms that are often blurred together in the AI-infrastructure rush. The company says it has secured 4.6 gigawatts of Resources across ten markets and about 2.3 gigawatts of Bookings, primarily from seven global hyperscale and technology customers. But Resources, as DayOne defines them, are not live compute. They include capacity already in service, capacity under construction and secured powered land with binding land and power arrangements plus the necessary approvals and permits. That makes DayOne's own operating ladder more important than its headline gigawatt figure. Bookings are legally binding customer commitments. Billings are the portion already producing income. Backlog is contracted capacity that is not yet income-generating. Capacity in service is ready for customers; capacity under construction is not. Put differently, 2,281 MW of demand has moved further toward monetization than 4.6 GW of Resources, but even that booked volume is not the same thing as energized, billable capacity. The progress is still substantial. Billings rose from 213 MW in June 2025 to 666 MW in June 2026 and then to 953 MW by Sept. 20, according to the filing. Utilization stood at 99.1%, and pre-commitment at 99.3%, both signs that DayOne is not building into empty rooms. Substantially all revenue comes from long-term data-center service contracts for space, power and cooling, with customer power consumption typically passed through. That supports the argument that hyperscalers are outsourcing a hard piece of AI expansion to specialist operators. It also means the key test is execution: getting land, power, permits, interconnection, labor, cooling and equipment aligned so that a signed contract actually turns into billings and, eventually, cash. Demand is real; concentration is, too. The company can fairly point to fast adoption. DayOne was incorporated in 2022, delivered its first campus in Johor, Malaysia, in 2023, and has since expanded into Batam, Singapore, Greater Bangkok, Tokyo, Greater Helsinki, Kuala Lumpur, Zaragoza and Kyushu. As of Sept. 20, it said it had bookings from 15 customers, with three hyperscale customers each deploying around or above 200 MW across multiple markets. For cloud buyers hunting AI capacity outside the most constrained U.S. hubs, that suggests DayOne is solving a real procurement problem. But the filing also shows how narrow the business still is. Malaysia supplied 87.0% of first-half 2026 revenue, and the top two customers accounted for 84.3%. Those figures do not negate the growth story; they define its current fragility. A platform concentrated in the SIJORI corridor and nearby markets may be able to secure land and power faster than operators in more saturated locations, but it is also more exposed to local grid policy, permitting, weather, currency and network conditions. And when a small number of hyperscalers represent most of the revenue, they tend to hold significant leverage over schedules, pricing and future expansion plans. That concentration matters for suppliers too. Utilities, transformer makers, cooling vendors, contractors and fiber providers can read DayOne's numbers as evidence of real build demand, especially with 1,328 MW under construction. They can also see that the pace of procurement depends heavily on a few customers continuing to take down capacity on time. The IPO test is financing as much as demand. If the operational question is delivery, the market question is balance-sheet stamina. DayOne says it raised $1.9 billion through Series A and B financings in 2024, $1.3 billion in 2025 and $3.2 billion in 2026 in connection with its Series C financing. As of June 30, the filing showed about $4.35 billion of long-term borrowings and $430.4 million of finance leases, alongside a shareholders' deficit. First-half revenue grew 238% year over year, but the net loss widened sharply, reminding investors that data-center development can scale revenue well before it proves equity returns after depreciation, interest and construction costs. That is why the filing's non-GAAP profitability picture needs context. DayOne reported a first-half net loss margin of 15.1% and an adjusted EBITDA margin of 40.2%. The adjusted figure may help show the earning power of operating sites before major non-cash and financing charges, but it does not erase the cash demands of turning backlog into live capacity. In this sector, a contract signed ahead of energization can be economically valuable and still leave the operator carrying months or years of delivery risk. The missing terms of the IPO underline how early the public-market test still is. The preliminary prospectus does not disclose the number of ADSs, price range, expected proceeds, valuation, use of proceeds or final governance terms. It also stops short of giving outsiders the project-by-project schedule they would need to map every megawatt from secured land to service date. Nor does it identify the seven main hyperscale customers or spell out termination rights, renewal economics or the margin structure on contracted power. The company also says its market estimates rely in part on a commissioned Structure Research report and warns investors not to give those estimates undue weight. So what does DayOne's prospectus actually settle? It makes the AI data-center boom more legible as an operating business: there is real revenue, real utilization, real contracted demand and a real multi-country buildout. But it also shows that the sector's headline gigawatt story still rests on a narrower set of facts than the marketing often implies: a few customers, a few key markets, a lot of capital and a long chain of things that must go right before booked capacity becomes dependable, billable infrastructure. The next filings will matter less for the slogan-size pipeline number than for a simpler measure of proof: how fast backlog turns into billings without the debt and concentration swallowing the economics. Isabella Garcia explores the societal impacts of technology for BizTech Weekly. With a background in sociology and a master's in communication, her articles delve into how technology reshapes human interactions, privacy, and its collective futures. Isabella's thought-provoking pieces challenge readers to consider the ethical dimensions of the digital age.

Techbooky
Oct 6th, 2026
DayOne files for US IPO as data centre revenue surges.

DayOne files for US IPO as data centre revenue surges. DayOne Data Centers has filed for a US initial public offering, putting one of Asia's fast-growing data centre operators in front of public investors at a moment when enthusiasm for AI infrastructure is running up against harder questions about cost and concentration. The Singapore-headquartered company made its registration statement public with the US Securities and Exchange Commission on October 5. It plans to list on Nasdaq under the ticker DODC, although the filing does not yet set a share price or establish how much it will raise. There is a clear growth story in the numbers. DayOne recorded $512 million in revenue for the six months ended June 30, up from $151.5 million a year earlier. That means it generated more revenue in half of 2026 than it did in all of 2025, when sales were $484.3 million. The company develops and operates large data centres for cloud and technology customers across Asia-Pacific, with projects extending into Europe. Growth has not removed the cost of building that capacity. DayOne reported a $77.2 million net loss for the first half, compared with a $12.6 million loss in the same period last year. The loss attributable to ordinary shareholders was $81.9 million. Those are different accounting measures, and the distinction matters when comparing coverage of the filing. A data centre company can sign long contracts and still need enormous amounts of capital before a building begins producing revenue. Investors will want to know how much capacity DayOne can bring online, whether power and construction schedules hold, and how quickly new facilities turn into cash-generating assets. They will also examine customer concentration: the filing says its largest customer accounted for about 69% of first-half 2026 revenue. That dependence does not by itself make the business weak. Large cloud customers often take substantial blocks of capacity under long-term agreements. But it means any change in one customer's expansion plans could matter greatly to DayOne's forecasts. The IPO gives investors a rare opportunity to inspect that trade-off in detail instead of simply accepting a headline about demand for AI. DayOne's move also speaks to a wider shift in technology finance. The AI race needs not only chips and models but land, electricity, cooling and buildings that can accommodate them. Techbooky has seen a similar appetite for infrastructure in the IPO discussion surrounding AI cloud company Nscale. DayOne's filing will test whether the public market is ready to fund that physical expansion while accepting its present losses. For now, this is a filing, not a completed listing. The eventual price and timing will say as much about investor confidence in the AI buildout as the company's rapid revenue growth does. Related reading. Follow TechBooky Follow TechBooky for more technology stories and newsroom updates. Paul Balo is the founder of TechBooky and a highly skilled wireless communications professional with a strong background in cloud computing, offering extensive experience in designing, implementing, and managing wireless communication systems. Search TechBooky Receive top tech news directly in your inbox. Freshly squeezed. October 2026 | M | T | W | T | F | S | S | | / | 1 | 2 | 3 | 4 | | 5 | 6 | 7 | 8 | 9 | 10 | 11 | | 12 | 13 | 14 | 15 | 16 | 17 | 18 | | 19 | 20 | 21 | 22 | 23 | 24 | 25 | | 26 | 27 | 28 | 29 | 30 | 31 | / |

New Straits Times
Oct 6th, 2026
Data centre operator DayOne reveals revenue surge in US IPO filing.

Data centre operator DayOne reveals revenue surge in US IPO filing. October 5, 2026 @ 5:41pm NEW YORK: Data centre operator DayOne Data Centers filed for an initial public offering in the United States on Monday, testing investor appetite for data-center listings amid challenging market conditions. The company posted a net loss of US$77.2 million on revenue of US$512 million for the six months ended June 30, compared with a loss of US$12.6 million on revenue of US$151.5 million a year earlier. The filing comes as surging bond yields and elevated interest rates cloud the outlook for the fall IPO market, prompting several major listings to be postponed. Data centres have also come under scrutiny over their heavy use of electricity, water and land, with communities raising concerns about their impact on power grids, utility bills and local resources. The Singapore-based company develops and operates data centres for cloud-computing and AI customers, providing space, power, cooling and connectivity, primarily under long-term contracts. DayOne operates across Asia-Pacific and Europe, including Malaysia, Indonesia, Thailand, Hong Kong, Japan, Finland and Spain, according to its filing. Shanghai-based GDS Holdings set up GDS International in Singapore in 2022, which was rebranded as DayOne in January 2025 following its separation from the parent company. The company has not disclosed the size of the offering, although Reuters reported in February that it was aiming to raise as much as US$5 billion at a potential valuation of US$20 billion. DayOne plans to use the IPO proceeds to develop and construct new data centre projects and for working capital and other general corporate purposes. Morgan Stanley, J.P. Morgan, BofA Securities and Citigroup are among the underwriters for the offering. DayOne plans to list its American depositary shares on the Nasdaq under the symbol "DODC".

Value Add VC
Oct 6th, 2026
DayOne Data Centers IPO 2026: inside the $5 billion Nasdaq filing at a $20 billion valuation.

DayOne Data Centers IPO 2026: inside the $5 billion Nasdaq filing at a $20 billion valuation. DayOne filed to raise up to $5 billion on Nasdaq under ticker DODC, with revenue nearly tripling in 2025 - but one customer drives roughly 69% of it. Editor-in-chief: Trace Cohen - Angel investor, VC, family office, operator and founder · 3x founder (BrandYourself, Launch.it, SPOT) · 65+ investments 65+Investments 3xFounder $200M+Funds Tracked Quick Answer $5 billion is the IPO size DayOne Data Centers is targeting on Nasdaq under ticker DODC, at a roughly $20 billion valuation, per its October 5, 2026 Form F-1. Revenue grew 172% to $484.3 million in 2025 and hit $512.0 million in just the first half of 2026, but one customer accounted for 69.4% of 2025 revenue. DayOne Data Centers filed to raise up to $5 billion on Nasdaq at a roughly $20 billion valuation on October 5, 2026 - and one customer accounts for 69% of its revenue. DayOne, a Singapore-based data-center operator, filed a Form F-1 with the SEC to list American depositary shares on Nasdaq under the ticker DODC, according to Reuters, via Investing.com. Morgan Stanley, J.P. Morgan, BofA Securities, Citi and BNP Paribas are leading the offering. The company was spun out of Shanghai-based GDS Holdings (Nasdaq: GDS), which established GDS International in Singapore in 2022 before deconsolidating and rebranding it as DayOne in January 2025. IPO Size (target) Target Valuation H1 2026 Revenue Top Customer Share DayOne Data Centers IPO: the revenue behind the $20 billion target. DayOne's revenue nearly tripled in 2025 and has already exceeded that full-year total halfway through 2026 - the growth underwriters are pointing to as the case for a near-$20 billion valuation on a company that didn't exist under its current name until January 2025. | Metric | 2024 (FY) | 2025 (FY) | H1 2026 | | Revenue | $178.1M | $484.3M | $512.0M | | YoY revenue growth | - | +171.9% | +238% vs. H1 2025 | | Net income / (loss) | - | - | ($77.2M), vs. ($12.6M) in H1 2025 | | Top customer, % of revenue | - | 69.4% | 69.2% | | No. 2 customer, % of revenue | - | 12.3% | 15.1% | | Trailing-twelve-month revenue (to Jun 2026) | - | - | ~$845M | Where DayOne operates and what it sells. DayOne sells data-center space, power, cooling and connectivity under long-term contracts to cloud and AI customers, with facilities across Malaysia, Indonesia, Thailand, Hong Kong, Japan, Finland and Spain - an Asia-Pacific-and-Europe footprint, deliberately excluding mainland China. Since its 2022 inception as a GDS Holdings spinout, the company has secured 4.6 gigawatts of combined capacity in service, under construction, or on secured powered land, including roughly 2.3 gigawatts of contracted bookings from seven global hyperscale and technology customers. DayOne's own F-1 names its largest customer only as "a global technology company with a leading short-form video platform serving a worldwide audience" - language that points to one of the world's largest short-video platforms without the filing naming it outright. That single relationship drove more than two-thirds of DayOne's revenue in both 2025 and the first half of 2026, and public-market investors tend to price that kind of dependency very differently than growth-stage venture investors do. For comparison, established US data-center operators like Equinix and Digital Realty disclose far more diversified tenant bases, which is part of why they trade at different multiples than a single-customer-anchored AI-infrastructure play like DayOne. DayOne's IPO Lands in the Middle of an AI Data Center Funding Wave. DayOne is one of several AI-infrastructure operators testing the market in 2026. Nscale is pursuing a $3.5 billion NYSE raise at a roughly $30 billion valuation backed by a $103 billion contracted backlog, while privately held builders have raised at similar multiples: Firmus closed a $2 billion round at a $10.5 billion valuation with Nvidia and Blackstone backing, and Fluidstack raised $1.5 billion at an $18 billion valuation from Jane Street. Set against that group, DayOne's roughly $20 billion target on $845 million of trailing revenue isn't an outlier multiple - it's consistent with how the market is currently pricing AI capacity providers, hyperscaler-anchor-customer risk and all. What the headline misses. DayOne's filing lands one week after Oura pulled its own $2.2 billion IPO citing market uncertainty, and amid a broader wave of AI-infrastructure capital-raising that includes Nscale's pending NYSE listing. Unlike Oura's deal, which was roughly 73% secondary shares benefiting existing shareholders, DayOne's offering is framed around funding new data-center construction - a distinction investors are likely to weigh given how poorly secondary-heavy IPOs have fared this fall. But a $20 billion target on roughly $845 million of trailing-twelve-month revenue implies a premium multiple that assumes the 69% customer-concentration risk gets diversified away quickly. That's a bet on renewal terms nobody outside the F-1's exhibits can currently see, not a certainty, and it's the single number likely to move the final valuation more than any other line in the filing. Revenue nearly tripled in 2025. One customer is 69% of it. DayOne's $20 billion target prices in rapid diversification away from a single tenant - a bet the roadshow, not the F-1, will actually test. Read the original Pulse coverage of DayOne's F-1 filing, and track the rest of the 2026 IPO pipeline on the IPO tracker at Value Add VC. Latest from the Pulse. Get VC data most people never see - free to subscribe Trace's notes on venture, AI and startups, a few times a week. Join 5,000+ subscribers. No spam. Frequently asked questions. When is the DayOne Data Centers IPO? What is DayOne Data Centers' IPO valuation? How much revenue does DayOne Data Centers make? Is DayOne Data Centers too dependent on one customer? Who is underwriting the DayOne IPO? New in AI & technology. Explore 45+ free VC tools, dashboards, and recommended startup software.

W Media
Oct 5th, 2026
DayOne plans 200MW data center in Japan's Imari City.

DayOne plans 200MW data center in Japan's Imari City. Jan is an experienced journalist having written on a diverse range of subjects including property and travel in the last 15 years; and business, economy, law, luxury, health and lifestyle. He is currently immersed in cloud, data centers and artificial intelligence, and thinks quantum computing is the next big thing. October 5, 2026 at 10:39 AM GMT+8 DayOne, a Singapore-headquartered global digital infrastructure platform, and Imari City last week announced plans to develop a new data center campus at Imari City, Saga Prefecture, Japan, with 200MW of grid power. Located on a site spanning 133,000 square meters within the Imari East Industrial Park, the campus will be developed in phases with the first phase targeted to be operational in 2030. The development includes 160MW of secured powered land, according to the firm's press release. The development is expected to support about 60 to 80 full-time roles once fully operational, in addition to local employment generated during its development, construction, and operation. Located in Kyushu, Japan's southernmost main island, the Imari campus expands DayOne's Japan platform beyond Tokyo, and is close to major Asian markets. It is supported by Saga Prefecture and Imari City. Jamie Khoo, Chief Executive Officer of DayOne, said, "Kyushu has the potential to become an important new location in Japan's digital infrastructure landscape. The Imari campus brings together Kyushu's regional advantages, the city's forward-looking leadership, and DayOne's experience in creating new digital infrastructure markets at scale. Working closely with Imari City, local partners, and the community, we intend to deliver the campus responsibly, build local capabilities, and create lasting value for Imari City, Saga Prefecture, and the wider region."