V

Vertiv

Builds power and cooling systems for data centers

Project Manager

Full-TimeUpdated on 10/23/2026
No salary listed
Expert
Omaha, NE, USA
In PersonRequires out-of-town and international travel for up to several months.
Project & Program ManagementProject Management
No H1B Sponsorship

About the job

Requirements
  • Strong knowledge of the National Electric Code and industry standards such as Occupational Safety and Health Administration standards and National Fire Protection Association standards.
  • Proficiency with Microsoft Word, Microsoft Project, Microsoft Excel, PowerPoint, Latista, Google Docs, and other project management software and applications.
  • Willingness to work flexible hours, weekends, holidays, and night work as required.
  • Ability to work in a service center or field environment, including extensive computer and telephone use.
  • Excellent verbal and written communication skills to communicate effectively with clients and their representatives, contractors, field engineers, peers, and management.
  • Mature judgment and the ability to be responsible for assigned projects and supervise, organize, and direct the work of others.
  • Strong communication, supervisory, and organizational skills.
  • Availability for out-of-town and international travel for up to several months.
  • Ability to stand, walk, use hands and fingers, talk and hear regularly; sit and work at a computer frequently; meet close-vision, distance-vision, basic color differentiation, and focus-adjustment requirements; and lift or move test equipment weighing up to 100 pounds.
  • Valid driver's license.
Responsibilities
  • Plan, direct, and coordinate activities of designated large-scale projects, potentially overseeing a single project or multiple projects, and ensure project goals and objectives are accomplished within prescribed time frames and profitability, personally and through assigned Field Engineers and Technicians.
  • Review project proposals or plans to determine time frames, funding limitations, procedures, staffing requirements, and resource allocation for project phases.
  • Confer with the Service Center Manager or Region Director to outline work plans and assign duties, responsibilities, and scope of authority.
  • Establish work plans and staffing for each project phase and arrange assignment of project personnel.
  • Direct and coordinate project personnel activities to ensure projects progress on schedule and within prescribed budgets.
  • Review status reports and other documentation prepared by project personnel, clients, and other contractors, and modify schedules or plans as required.
  • Prepare and present project reports for management, clients, or others, and gather and develop supporting material for change order requests.
  • Confer with project personnel to provide technical advice and resolve problems.
  • Coordinate project activities with clients and other contractors as required.
  • Directly supervise Field Engineers and Technicians during the time they are assigned to projects.
  • Develop large-scale project management processes and routines for use throughout the company.
  • Mentor junior personnel and teach good project management practices.

About the company

Vertiv builds power and cooling equipment that keeps data centers, communication networks, and industrial facilities running through outages and heavy computing loads. Its Liebert cooling systems manage the heat generated by servers, while its power products protect equipment and distribute electricity. The company sells equipment directly and through distributors, then earns additional revenue from installation, maintenance, spare parts, and services throughout the equipment life cycle. Its portfolio also includes racks and software for monitoring and managing IT equipment. Vertiv became a standalone company in 2016 and is headquartered in Westerville, Ohio.

Company Size

10,001+

Company Stage

IPO

Headquarters

Westerville, Ohio

Founded

2016

Get referred to Vertiv

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Sales growth supports expansion: Vertiv reported 24% higher quarterly revenue in July 2026.
  • Ohio career opportunities are planned: Vertiv announced hundreds of additional jobs through 2029 in March 2026.
  • Career planning has a formal structure: Vertiv lists its Career Framework in the employee rewards package.

What critics are saying

  • Large deployments strain delivery: Vertiv reported supply-chain congestion and project timing shifts in July 2026.
  • Booked demand carries cancellation risk: Vertiv's $15 billion December 2025 backlog allows customers to defer or reduce commitments.
  • Job security faces cost targets: Vertiv's ongoing restructuring program includes workforce reductions across all segments.

What makes Vertiv unique

  • Cooling expertise predates the AI boom: Liebert pioneered precision computer room air conditioning in 1965.
  • Modular sites support varied power standards: Vertiv SmartMod integrates factory-tested enclosures with 12V, 48V, or 400V DC.
  • Field support has global scale: Vertiv reports approximately 5,000 service engineers and 320 service centers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Vacation
  • Paid Sick Leave
  • 401(k) Retirement Plan
  • Flexible Work Hours
  • Remote Work Options
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

-1%
Yahoo Finance
Oct 24th, 2026
Vertiv shares fall 39% ahead of Oct 28 earnings as AI delivery faces test

Vertiv (NYSE: VRT) reports third-quarter results on October 28, with investors looking for proof that delayed AI projects are now shipping. Shares have fallen 39% from their first-quarter report price of $319.09 to $194.31, about 29x 2026 consensus EPS. The stock dropped 17.26% after second-quarter results, despite revenue up 24.1% to $3.27 billion and adjusted EPS up 60% to $1.52. Organic growth slowed to 18%, which management blamed on supply chain congestion and project timing. Guidance for the third quarter calls for about 35% organic growth, a 24.5% adjusted operating margin, and $3.75 billion in revenue. Options traders look cautious, with a put/call ratio of 2.54. On October 21, Vertiv said its NVIDIA DSX approach targets up to 30% more cumulative AI token output in the first 12 months.

Yahoo Finance
Oct 22nd, 2026
Vertiv shares fall 8.65% to $193.80 despite model showing 30% more AI output

Vertiv shares fell 8.65% to $193.80 at about 11:46 ET on Thursday, even as the data-centre power and cooling supplier said a new deployment model could speed up AI projects. Using NVIDIA DSX, Vertiv modelled up to 30% more cumulative AI token output in a project's first year. Its scenario cuts design and validation from 30 days to three, and halves infrastructure deployment from 90 days to 45. That yields 317 productive days instead of 245. The gains are modelled, and actual results depend on execution. Polar Data Centers is applying the factory-built approach to the first 41-megawatt phase of its Herya campus in Norway. Vertiv's second-quarter adjusted operating margin was 22.6%, up 410 basis points year over year.

Associated Press
Oct 22nd, 2026
Dassault Systèmes and Vertiv partner to cut AI factory deployment time by up to 50%

Dassault Systèmes and Vertiv Holdings Co. announced a collaboration to let AI factory infrastructure be configured, simulated and validated before construction begins. The companies aim to cut field complexity and speed up deployment of NVIDIA DSX AI factories. Vertiv's SimReady power and cooling designs will run on Dassault Systèmes' 3DEXPERIENCE platform as configurable virtual twins. The work builds on Vertiv's SmartRun twin and extends to solutions such as Vertiv OneCore. The companies target up to 10x faster progress from requirements to a validated design, and up to 50% less deployment time. In Vertiv's model, capacity comes online about 10 weeks sooner, yielding up to 30% more token output within 12 months. The gain comes only from earlier readiness, not a measured customer result. The companies are showing the approach at NVIDIA GTC Berlin, October 20-22.

MarketScreener
Oct 21st, 2026
Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure.

Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure. Published on 10/21/2026 at 08:50 am EDT S&P Capital IQ Vertiv Holdings Co. and NVIDIA introduced an AI factory approach that combines rapid configuration and virtual validation of pre-engineered reference architectures with factory-built deployment. The approach is designed to move AI factories from project kickoff to productive capacity faster and, under defined assumptions, generate up to 30% more cumulative token output within the first 12 months with the same installed capacity. The Vertiv and NVIDIA approach starts instead with pre-engineered AI factory reference architectures that can be rapidly configured to customer and site requirements, virtually validated before deployment, then translated into factory-built infrastructure. Teams can start with pre-engineered AI factory reference designs and rapidly configure them for specific compute, power, cooling and facility requirements in a shared virtual environment. The approach combines the NVIDIA Vera Rubin DSX AI Factory reference design and NVIDIA Omniverse DSX Blueprint, with Vertiv SimReady power and cooling assets, integrated with Dassault Systèmes' 3DEXPERIENCE agentic platform. Rather than developing an integrated infrastructure design from scratch, teams can configure and virtually validate proven reference designs against project requirements, interfaces and constraints. In the modeled scenario, this reduces the time from requirements to a configured and validated AI factory solution from approximately 30 days to three days, a 10x improvement. Vertiv is also contributing SimReady OpenUSD assets of its power and cooling equipment to SimReady Central Library on Hugging Face. The library helps engineering teams discover and reuse validated equipment assets in AI factory digital twins, reducing asset preparation and helping teams evaluate infrastructure options during design. Once the AI factory configuration is validated, Vertiv prefabricated solutions shift more assembly, integration and testing into the factory before equipment reaches the site. These solutions include Vertiv? OneCore, a hybrid-built data center solution that integrates critical power, thermal management and supporting infrastructure, and Vertiv? SmartRun, a prefabricated overhead infrastructure system for high-density power distribution, liquid cooling, networking and containment. By moving more infrastructure work off-site, teams can reduce field complexity and on-site integration requirements. In the modeled scenario, the factory-built approach reduces the infrastructure deployment period from approximately 90 days to 45 days, a reduction of up to 50%. Combined with the faster configuration and validation enabled by pre-engineered reference designs, the modeled approach reduces these stages from approximately 120 days to 48 days. That can make productive AI capacity available about 10 weeks sooner, generating up to 30% more cumulative token output within 12 months of project kickoff with the same installed capacity. (C) S&P Capital IQ - 2026

Securities.io
Oct 21st, 2026
Vertiv and NVIDIA debut AI Factory approach as Polar deploys in Norway.

Vertiv and NVIDIA debut AI Factory approach as Polar deploys in Norway. Published October 21, 2026 Fatima El-Sayed Data Centers & AI Infrastructure, AI Research Agent Vertiv Holdings Co and NVIDIA on October 21, 2026 introduced an AI factory approach at NVIDIA GTC Berlin that combines rapid configuration and virtual validation of pre-engineered reference architectures with factory-built deployment, and Polar Data Centers is applying the factory-built deployment model to the first 41 MW phase of its multiphase AI data center at Herøya, Norway. Under defined assumptions, the approach is designed to generate up to 30% more cumulative token output within the first 12 months with the same installed capacity, Vertiv said in its announcement. For AI factory operators, securing compute is only part of the challenge, the company said. Traditional infrastructure development can require power, cooling and facility systems to be engineered and integrated through separate, sequential processes, creating complexity and potential delays. The Vertiv and NVIDIA approach starts instead with pre-engineered AI factory reference architectures that can be rapidly configured to customer and site requirements, virtually validated before deployment, and then translated into factory-built infrastructure. Configure and validate, then deploy. The configuration stage combines the NVIDIA Vera Rubin DSX AI Factory reference design and the NVIDIA Omniverse DSX Blueprint with Vertiv SimReady power and cooling assets, integrated with Dassault Systèmes' 3DEXPERIENCE agentic platform. Rather than developing an integrated infrastructure design from scratch, teams configure and virtually validate the reference designs against project requirements, interfaces and constraints. In Vertiv's modeled scenario, this reduces the time from requirements to a configured and validated AI factory solution from approximately 30 days to three days, which the company describes as a 10x improvement. A footnote to the announcement states the figure is modeled, measuring the time to an initial integrated design configured and validated in the digital twin against a 30-day conventional design process, and that results vary by project. Vertiv is also contributing SimReady OpenUSD assets of its power and cooling equipment to the SimReady Central Library on Hugging Face. According to the announcement, the library helps engineering teams discover and reuse validated equipment assets in AI factory digital twins, reducing asset preparation and helping teams evaluate infrastructure options during design. Once a configuration is validated, Vertiv's prefabricated solutions shift more assembly, integration and testing into the factory before equipment reaches the site. These solutions include Vertiv OneCore, a hybrid-built data center solution that integrates critical power, thermal management and supporting infrastructure, and Vertiv SmartRun, a prefabricated overhead infrastructure system for high-density power distribution, liquid cooling, networking and containment. In the modeled scenario, the factory-built approach reduces the infrastructure deployment period from approximately 90 days to 45 days, a reduction of up to 50%. The footnote defines this as on-site power and cooling deployment with Vertiv factory-built infrastructure against a 90-day conventional on-site baseline, again with results varying by project. Combined with the faster configuration and validation stage, the modeled approach reduces these stages from approximately 120 days to 48 days, the company said, which can make productive AI capacity available about 10 weeks sooner. The 30% token-output figure carries its own footnote: the first 12 months are measured from design kickoff as 317 versus 245 productive days at equal installed capacity, based on 3 + 45 versus 30 + 90 days, and actual results will vary. Polar Data Centers at Herøya. At its Herøya campus in Norway, Polar is using Vertiv's factory-built deployment model for the first 41 MW phase of its multiphase AI data center, which is scalable to 100 MW. Vertiv is supplying prefabricated power and thermal modules, Vertiv SmartRun overhead infrastructure and Vertiv SmartMod, supported by Vertiv Unify software. The announcement states the deployment model is designed to reduce on-site complexity and help make high-density, liquid-cooled capacity available to customers sooner. "An AI factory earns its return in tokens, and every day spent configuring infrastructure or integrating it on site is output that never comes back," said Giordano Albertazzi, CEO of Vertiv. He said success depends on how quickly operators can move from requirements to productive AI capacity, and that Polar is demonstrating how the approach can be applied at scale in a real-world AI factory deployment. "Our customers measure us on how quickly capacity is ready for them," said Andy Hayes, CEO of Polar Data Centers. He said Vertiv's factory-built infrastructure helps Polar manage the complexity of deploying power, cooling and white-space systems for high-density computing at Herøya, giving the operator a more disciplined, repeatable deployment model while preserving the flexibility to meet customer requirements. Vladimir Troy, vice president of AI infrastructure at NVIDIA, said AI factories must be designed as one system and that the Vera Rubin DSX AI Factory reference design helps teams align compute, power and cooling requirements from the outset. He said the Omniverse DSX Blueprint allows companies such as Vertiv and Dassault Systèmes to simulate these systems together and carry an integrated design into physical deployment. Stéphane Sireau, vice president for the high-tech industry at Dassault Systèmes, said the companies are engineering the factory as one system, with compute, networking, power and cooling co-designed and co-simulated in a virtual twin, so integration issues are resolved before construction rather than on site. Elements of the approach were announced earlier in 2026. NVIDIA introduced the Vera Rubin DSX AI Factory reference design and general availability of the Omniverse DSX Blueprint on March 16, 2026, naming Vertiv among the industry companies contributing platforms and SimReady assets to the architecture. That release said Vertiv was using the blueprint to build Vertiv OneCore Rubin DSX, a prefabricated, converged data center infrastructure solution designed to accelerate AI factory deployment and AI output per watt. The reference design spans compute, NVIDIA Spectrum-X Ethernet networking and storage, with documentation covering power, cooling and control systems, and its software libraries include DSX Max-Q, DSX Flex, DSX Exchange and DSX Sim. On June 1, 2026, Vertiv announced progress on a production-grade digital twin capability for Vertiv SmartRun integrated in the NVIDIA Omniverse DSX Blueprint, describing it as the first phase of a multi-phase AI factory digital twin roadmap. The capability was created using Dassault Systèmes' model-based systems engineering on the 3DEXPERIENCE platform, and Vertiv said it would demonstrate it at Computex Taipei 2026. Vertiv and NVIDIA plan to demonstrate elements of the approach at NVIDIA GTC Berlin, including how facility requirements inform infrastructure configuration, how teams can virtually validate power and cooling requirements, and how Vertiv applies factory-built infrastructure to accelerate physical deployment. The demonstration will feature technology from Dassault Systèmes, and Polar Data Centers will show how the deployment approach is being applied in a real-world AI factory. The demonstrations are at Vertiv booth #3055, and Scott Armul, Vertiv's chief product and technology officer, is scheduled to present Building the AI Factory: Converting Megawatts into Intelligence during a sponsored expo-theater session on October 22, 2026, from 4:00 to 4:15 p.m. CEST. Fatima El-Sayed is an AI-generated markets research agent at Securities.io, covering Data Centers & AI Infrastructure and the public companies, market infrastructure and investable technologies shaping that field. Fatima El-Sayed monitors hyperscale data centers, cloud platforms, AI hosting, power procurement, cooling, networking, data-center REITs and utility exposure. Coverage follows a infrastructure-minded, power-aware, financially rigorous perspective, prioritizing first-party announcements, company fundamentals, competitive positioning and developments with material relevance for investors. Articles authored by Fatima El-Sayed are AI-generated and reviewed by Securities.io's editorial team to ensure factual accuracy, source quality and responsible coverage. Content is provided for educational purposes and does not constitute investment advice.