T

Tokyo Electron

Corporate venture investing in semiconductors, displays

Principal FEOL/MOL Integration Engineer

Process EngineeringConfirmed live in the last 24 hours
Full-timeAlbany, NY, USA

About the Job

Requirements

  • Demonstrated FEOL/MOL process integration experience, with a strong track record of building new processing routes from flow definition through wafer execution.
  • Hands-on electrical/parametric test experience, including test structure design and interpretation, PCM/wafer-level parametrics, and probe/test-program coordination; this capability is strongly preferred and required for the e-test build-out.
  • Experience leading cross-functional or cross-business-unit technical projects, including planning and scheduling.
  • Metrology and analysis tool operation, including inline CDSEM and cross-sectional SEM.
  • Knowledge of design of experiments (DOE) and techniques for tool and process optimization.
  • Strong verbal and written communication skills, including technical presentations.
  • Self-management, teamwork, collaboration, and problem-solving skills.
  • Proficiency with personal computers, peripherals, and standard software, including Microsoft Windows, Microsoft Office, and networking.
  • A Master's degree in a related science or engineering field with at least 8 years of related semiconductor-industry engineering experience; or a PhD with at least 5 years of experience; or a Bachelor's degree with at least 10 years of experience.
  • Semiconductor integration experience is required.
  • Ability to work in a cleanroom environment, wear specialized cleanroom attire for extended periods, and lift or carry FOUPs.
  • Comfort working in a highly regulated setting and adhering to strict cleanliness and safety protocols.
  • U.S. work authorization is required.

Responsibilities

  • Serve as the principal technical authority for FEOL/MOL integration, driving direction, priorities, and technical quality through hands-on execution and mentorship as a senior individual contributor, with no direct reports.
  • Define and build process integration routes across lithography, etch, films, wet processes, and chemical-mechanical planarization (CMP) for FEOL/MOL test vehicles, including flow definition, mask/reticle planning, and split strategy.
  • Establish and own electrical-test capability for the team, including parametric test structure and PCM design, test-chip planning, probe-card and test-program coordination, wafer-level parametric extraction, and correlation of electrical results with unit-process and integration variables.
  • Lead cross-business-unit projects by coordinating roadmaps, tool capabilities, and deliverables across business units, factories, and onsite partners to address current and future customer needs through standard and novel integration flows.
  • Design, execute, and demonstrate proposed integration solutions on internal test vehicles, including statistical analysis of results.
  • Own lot management, including process splits, design of experiments, metrology setup, and data analysis and evaluation.
  • Support internal and external stakeholders in resolving integration and process issues through current and future equipment capabilities.
  • Maintain rigorous quality-control, documentation, and data-integrity practices and set those standards for the team.
  • Work with onsite business units, factories, and ecosystem partners to verify and integrate processes that demonstrate the benefits of the company's tools and processes for advanced logic and memory devices.
  • Own route architecture end to end, from flow definition through wafer execution, electrical characterization, and data-driven decision-making.
  • Set the technical standard for other engineers.
  • Perform regular hands-on fab work in office and cleanroom/fab settings; the role typically involves 4–6 hours per day at a computer, with the remaining time in the cleanroom or lab.
  • Occasionally lift office products and supplies weighing up to 35 pounds.

Desired Qualifications

  • Experience with lot management using SIVIEW MM/SM.
  • Experience with extreme ultraviolet (EUV) lithography and/or 193i immersion lithography.
  • Strong data-analysis skills and experience with JMP or equivalent statistical software, Excel, and measurement/analysis software such as Quartz PCI.
  • Unit-process experience across lithography, including scanner/track recipe setup and mask installation, etch, films, wet processes, and/or CMP.
  • Prior experience as a principal or senior individual contributor, or driving multi-stakeholder technical programs.

About the Company

Tokyo Electron

Corporate venture investing in semiconductors, displays

temp

Company size
11-50
Company stage
IPO
Headquarters
Fremont, CA
Founded
1963

Recently Posted Jobs

Explore more opportunities at Tokyo Electron

See more jobs