B

Blue Origin

Builds rockets, engines and lunar spacecraft

Electrical Harness Design Engineer 2

Full-Time
$107.1k - $150k
Junior
Bachelor's
Washington, USA
In Person
Electrical Engineering

About the job

Requirements
  • A Bachelor of Science degree in Aerospace, Electrical, Mechanical, Physics, Computer, or Aerospace Engineering, or a related technical subject area.
  • At least 2 years of experience designing wire harnesses.
  • At least 2 years of experience creating schematics, system interconnect diagrams, block interconnect diagrams, and wiring interconnect diagrams.
  • Experience with the configuration management cycle of harness drawings.
  • Understanding and application of wire derating analysis.
  • Familiarity with the applicable harness standard IPC/WHMA-A-620A.
  • Electrical and mechanical design and integration skills using 3D CAD software; CREO and Zuken are preferred.
  • Knowledge of harness fabrication and installation processes.
  • Must be a U.S. citizen or national, U.S. permanent resident, or lawfully admitted into the U.S. as a refugee or granted asylum.
Responsibilities
  • Develop engineering, system interconnect diagrams, block interconnect diagrams, and wiring interconnect diagrams.
  • Integrate and install electrical harnesses.
  • Design electrical harnesses for power distribution, radio frequency, communication, and high-speed data signals; select harness components, hardware, connectors, backshells, cable, and wire.
  • Apply electromagnetic interference and radio-frequency interference principles and harness shielding.
  • Create 3D routed harness data files using 3D CAD software.
  • Design and integrate harness support brackets, support design configuration development and trade studies, and provide technical guidance for hardware installation.
  • Support harness assembly development across the product lifecycle, including concept and requirements definition, design, analysis, design review, manufacture, test, and release to production.
  • Support the design and build of hardware-in-the-loop test beds, focusing on lab infrastructure such as racks and harnesses.
Desired Qualifications
  • Experience designing and integrating electrical harnessing for spacecraft, launch vehicles, or aircraft.
  • Experience with Zuken E3 software.
  • Experience with launch vehicle or spacecraft electrical and mechanical systems.

About the company

Blue Origin builds rockets, engines and spacecraft for commercial satellite operators and government space programs. Its New Glenn orbital rocket uses a reusable first stage, while Blue Moon landers are designed to transport cargo and astronauts to the lunar surface. The company designs and manufactures liquid-fueled propulsion systems, and its New Shepard vehicle is built for short suborbital trips carrying people and research payloads. Customers pay for launch services and engines, and government development contracts fund work on systems for exploration beyond Earth orbit. Founded by Jeff Bezos in 2000, Blue Origin is headquartered in Kent, Washington.

Company Size

10,001+

Company Stage

Late Stage VC

Total Funding

$10.1B

Headquarters

Kent, Washington

Founded

2000

Get referred to Blue Origin

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Blue supports retirement savings: its 401(k) matches employee contributions through the first 5% of compensation.
  • Further study receives company funding: Blue Origin financially supports employees pursuing higher education.
  • Lunar demand adds funded work: NASA awarded Blue $188 million for rover delivery task orders in May 2026.

What critics are saying

  • New Shepard teams face a reset: Blue's January 2026 pause lasts at least two years, redirecting resources toward lunar development.
  • Hotfire damage disrupted operations: New Glenn's May 2026 hotfire anomaly destroyed its lightning tower and transporter-erector.
  • Blue bears lunar cost pressure: NASA's $3.4 billion human-lander contract fixes the price of development and demonstrations.

What makes Blue Origin unique

  • Blue powers a competitor: its BE-4 engines fly on United Launch Alliance's Vulcan rocket.
  • Bulky payloads fit New Glenn: its seven-meter fairing holds twice the volume of five-meter designs.
  • Blue Ring crosses propulsion categories: its spacecraft design combines solar electric and chemical propulsion.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Medical insurance
  • Dental insurance
  • 401k
  • PTO
  • Relocation
  • Education Support Program
  • Dog friendly
  • Bundled insurance rates
  • Company paid life & disability

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

0%
Top Tech News
Oct 22nd, 2026
When will SpaceX and Blue Origin fly to the moon? NASA reveals lunar lander timelines (and an Artemis III update).

When will SpaceX and Blue Origin fly to the moon? NASA reveals lunar lander timelines (and an Artemis III update). October 22, 2026 NASA has revealed new details about its plans to return astronauts to the surface of the moon, outlining a series of upcoming milestones for SpaceX and Blue Origin as both companies race to ready their lunar landers for the agency's Artemis program. During an Oct. 5 presentation at the Astronautical Congress (IAC) in Antalya, Türkiye, Steve Creech, acting manager of NASA's Human Landing System (HLS) Program, laid out development timelines for both spacecraft, with key demonstrations planned through early 2028 that include orbital refueling and uncrewed lunar landing tests to qualify the vehicles to fly astronauts to the surface of the moon. A more pressing deadline, however, is NASA's Artemis III mission, which is targeted for the third quarter (Q3) of 2027. Artemis III will launch four astronauts aboard NASA's Orion spacecraft to low Earth orbit (LEO), where they will rendezvous and dock with test versions of both companies' landers for interoperability checkouts. Those demonstrations will help inform NASA's determination about which lander the agency will choose to carry astronauts to the moon's surface on Artemis IV, targeted for early 2028. SpaceX and Blue Origin were both awarded NASA contracts to develop HLS vehicles - Starship and Blue Moon, respectively - and have spent the past several years refining their respective lunar lander designs and dealing with various delays along the way. In the face of those delays, and in an effort to better structure its mission progression for success, NASA overhauled its Artemis program architecture in February to maintain its goal of landing astronauts on the moon by the end of 2028 and establish a more regular cadence of uncrewed landings in the meantime. As part of that shakeup, Artemis III, previously the program's first crewed lunar landing mission, was moved up a year and repurposed for the lunar lander vehicle tests the agency is preparing to fly to LEO next year. The program's first moon landing remains scheduled for 2028, but was shifted to the manifest for Artemis IV. Between now and then, both SpaceX and Blue Origin have more than a dozen test demonstrations and vehicle milestones to achieve, including success during Artemis III and flights afterward. This will all lead up to a key decision NASA must make: Which vehicle will carry out the first crewed landing on the surface of the moon since the Apollo program ended in 1972? Starship reached for the first time on its most recent test flight, which occurred on Sept. 28 from SpaceX's Starbase site in South Texas. NASA lists several other important goals for the vehicle to achieve in 2026, including (in the order listed during the IAC presentation) the first return and catch of the rocket's upgraded Version 3 (V3) booster at its launch pad; the first-ever return and catch of a Ship upper stage; the first Starship launch from one of SpaceX's launch pads still under construction on Florida's Space Coast; and, possibly, the first V3 booster reflight. NASA also expects SpaceX to complete the initial build of the crew cabin for its lunar lander Starship variant. SpaceX released renders of Starship's interior last year, as well as images of the test elevator astronauts are using to train for Starship egress on the lunar surface, but little else has been made public about the progress the company has made on the cabin's design. Should the cabin's initial build wrap up by the end of the year, as NASA's presentation suggested, SpaceX will use Q1 2027 to complete integration of the systems that Starship will need to communicate with Orion during Artemis III, and deliver a cabin simulator for astronauts to train on leading up to the mission. SpaceX plans to continue Starship test flights through Q2 of next year, complete a landing leg demonstration and begin crew cabin airlock tests. Blue Origin's lunar lander mockup is ready for NASA Artemis astronaut training For Artemis III, SpaceX plans to fly one of its existing V3 Starship upper stages, with some slight modifications. Starship and Orion will dock as part of Artemis III but the SpaceX vehicle won't be equipped with a crew cabin for the mission's astronauts to enter. Between the end of this year and the beginning of the next, SpaceX is expected to complete the addition of a docking system and nosecone cover to the Artemis III Starship vehicle, which, NASA documents suggest, has already completed its mechanical fit checks. Other notches on SpaceX's checklist leading up to Artemis III include the first propellant transfer demonstration with Starship in orbit. As the first-ever launch vehicle and spacecraft designed for full reusability, Starship's fuel constraints require that its tanks be topped off in order to fly beyond LEO. For a moon landing mission, this could mean up to a dozen launches of SpaceX's Starship "tanker" spacecraft to an orbiting fuel depot, which the moon-bound Starship will visit. To pull that off, though, SpaceX has to show it can successfully transfer those cryogenic fuels on orbit, and also store them effectively enough to prevent too much boil-off. Starship won't require any refueling flights to complete its objectives for Artemis III, but SpaceX is expected to launch its first Starship tanker vehicle within a few months of that mission as it gears up for the Artemis IV moon landing mission. To that end, a launch of an uncrewed Starship lunar lander variant is targeted sometime toward the end of Q3/beginning of Q4, with an uncrewed lunar landing mission carried out before the end of 2027. Blue Origin, meanwhile, has its own set of milestones to meet as it develops its Blue Moon Mark 2 (MK2) lander - a 52-foot-tall (16 meters) spacecraft powered by three BE-7 engines. Unlike the bare-bones V3 Starship that SpaceX will launch on Artemis III, Blue Origin plans to fly a completed test vehicle, incorporating the crew cabin, partial life-support, flight software and other systems needed to allow astronauts to enter the lander from Orion during their time docked in LEO. Astronauts will be able to enter Blue Moon from Orion to get a feel for the lander in zero-g and test some of its systems. NASA's timeline shows the company working to complete a series of manufacturing and testing milestones in the last few months of 2026, including continued BE-7 testing and qualification of Blue Moon's BT-7 maneuvering thrusters. The company also faces its Artemis III interim design review and a critical design review for an upcoming landing demonstration mission in 2028. Blue Origin is also working to restore its pad at Cape Canaveral Space Force Station's Launch Complex-36 (LC-36) to operation and return its New Glenn rocket to flight, following an explosion of the rocket in May that caused extensive damage to the facility. NASA's presentation places that milestone in Q4 2026, a timeline the company has also been very vocal about maintaining. A recent Reuters report, however, suggests that may not happen until early 2027. By early 2027, the company expects to complete the spacecraft's communications systems and finalize its flight software, with assembly, integration and testing continuing into Q2. Q1 2027 is also when Blue Origin's Blue Moon MK1 lander (a smaller, uncrewed version of its MK2 successor) will launch to the lunar surface as a part of NASA's Commercial Lunar Payload Services (CLPS) program of robotic moon missions. During Q2 2027, as the Artemis III mission approaches, Blue Origin is expected to complete integration of its test lander with New Glenn and conclude qualification of its BE-7 engine. Throughout next year, the company plans to continue construction and refurbishments at its launch facilities and hopes to have a new launch pad ready to support the upgraded, more powerful New Glenn 9x4 rocket l by the end of Q3. The first flight of that rocket variant is scheduled for Q4 2027, alongside a second MK1 lunar mission and the launch of an uncrewed MK2 demonstration lander. That spacecraft is expected to attempt its own uncrewed lunar landing in Q1 2028, around the same time Blue Origin has scheduled a third MK1 flight. Like SpaceX, Blue Origin will need to demonstrate that its lander can safely reach the moon's surface,operate there and return to lunar orbit before NASA clears it to carry astronauts on a future Artemis mission. NASA's overall timeline remains the same as it has been since the February revamp, with Artemis III expected to launch in mid-2027, followed by a crewed lunar landing on Artemis IV in 2028, and possibly another on Artemis V that same year. There may be changes on the horizon, though. NASA will host a press conference on Friday (Oct. 23) with Administrator Jared Isaacman and Associate Administrator Amit Kshatriya, as well as Artemis program director Jeremy Parsons. During the event, which you'll be able to watch here at Space.com, they will discuss the status of the upcoming moon missions and an "Artemis acceleration." SpaceX and Blue Origin still face tight schedules to complete their respective uncrewed landing demonstrations before Artemis IV. With SpaceX targeting Q4 2027 and Blue Origin Q1 2028, both are pushing the margins against NASA's hopes to return astronauts to the lunar surface that same year. Which company ultimately gets the green light for that first landing mission will depend on the progress each makes between now and then, and whether their landers can demonstrate the readiness that NASA requires to safely carry astronauts to the surface of the moon and back again.

Mobile World Live
Oct 19th, 2026
Blue Origin commits $330M to rocket infrastructure.

Blue Origin commits $330M to rocket infrastructure. Jeff Bezos-owned Blue Origin outlined a plan to spend $330 million on extensive upgrades to its launch facilities in the US state of Florida to support multiple flights per week by the end of the decade. Blue Origin revealed it will add two additional launch and landing pads for its New Glenn rockets while also boosting its second stage manufacturing capabilities. Ian Richardson, Blue Origin's SVP of operations, stated in a blog the expansion will be completed by the middle of 2027. "These investments are centred on one goal: building the capacity to support more missions, more reliably, and more efficiently," he said. "As we look ahead, this infrastructure is designed to support multiple flights per week by the end of the decade." The upgrades also include a new customer integration facility with the US Space Force at Cape Canaveral Space Force Station in Florida to give it "the ability to prepare multiple missions at once". Richardson noted the company has invested more than $3 billion in facilities and infrastructure across the state with more than 5,000 employees. Blue Origin is seeking to ramp up the cadence of its rocket launches to better compete against Elon Musk's SpaceX. Currently, Blue Origin has 396 LEO birds in orbit while SpaceX has approximately 11,150 Starlink satellites. While SpaceX and Blue Origin use their rockets to launch satellites from other companies, CNBC reported the former has stopped commercial rides on its Falcon 9 rocket to support its larger Starship model. Blue Origin suffered a setback in May when one of its New Glenn rockets exploded on the Florida launch pad. In July, Blue Origin CEO Dave Limp outlined a plan to rebuild its launch pad with a new configuration as it works toward returning its New Glenn rocket to flight before the end of 2026.

Blue Origin
Oct 19th, 2026
Blue Origin's P-Sampler launches aboard JAXA's Martian Moons eXploration mission.

Blue Origin's P-Sampler launches aboard JAXA's Martian Moons eXploration mission. Blue Origin's Pneumatic Sampler (P-Sampler), a sampling system designed to collect surface material from the Martian moon Phobos, launched today aboard the Japan Aerospace Exploration Agency's (JAXA) Martian Moons eXploration (MMX) spacecraft from Yoshinobu Launch Complex at the JAXA Tanegashima Space Center. The system, built by Honeybee Robotics, a Blue Origin company, will play a key role in JAXA's effort to return the first-ever samples from a Martian moon to Earth. MMX is a JAXA-led mission in collaboration with NASA, CNES, and other international partners, aiming to be the first mission to return samples from a Martian moon to Earth. Those samples could help scientists answer long-standing questions about the origins of Phobos and Deimos and offer new insight into the early history of the Mars system. Collecting surface material from a body like Phobos presents unique engineering challenges. With extremely low gravity, traditional digging or scooping methods don't behave as they would on Earth, the Moon, or even Mars. To address this, the team designed the P-Sampler to use pressurized nitrogen gas to loosen and lift regolith from the surface into a collection chamber, similar in concept to a reverse vacuum cleaner. This approach allows for efficient sample collection without requiring the spacecraft to anchor or exert significant mechanical force against the surface. P-Sampler sampling head is designed to capture samples while being mounted on a footpad - several inches above the surface. P-Sampler builds directly on Honeybee Robotics' PlanetVac technology, a pneumatic regolith acquisition system successfully demonstrated on the lunar surface. That flight demonstration validated the core approach of using gas-driven sample collection in a low-gravity, airless environment, providing critical real-world performance data that gave Honeybee's engineers confidence to apply the technology to an even more challenging destination. The lessons learned on the Earth's Moon directly informed the design of P-Sampler, enabling Honeybee to adapt the technology for Phobos' unique surface conditions. In this way, P-Sampler represents a natural evolution of Honeybee's work - proving out sampling technology on the Moon, then extending it to new frontiers across the solar system. "We're proud to see P-Sampler on its way to Phobos," said Kris Zacny, vice president of Exploration Systems at Blue Origin. "This technology builds on decades of sampling expertise, including our PlanetVac demonstration on the Moon. That heritage gave us the confidence to take this next step, and we're excited to see it put to the test in the Martian system." With launch complete, the spacecraft has begun its journey toward Phobos, where it will eventually carry out sample collection operations using both P-Sampler and a complementary coring tool known as C-Sampler, developed by JAXA. Together, these systems are designed to maximize the mission's chances of successfully acquiring material for return to Earth. Blue Origin look forward to following MMX's journey in the years ahead and sharing updates as the mission progresses toward Phobos.

Morning Top News
Oct 16th, 2026
Blue Origin plans $330 million Florida expansion to ramp New Glenn launches.

Blue Origin plans $330 million Florida expansion to ramp New Glenn launches. Advertisements Jeff Bezos' Blue Origin said Friday it plans to make extensive upgrades to its Florida launch facilities with the goal of supporting multiple flights per week by the end of the decade. The company will add two more launch and landing pads for New Glenn, its heavy-lift, partially reusable rocket. A $330 million expansion to its Rocket Park campus in Cape Canaveral, expected to be complete in the summer of 2027, will enable it to produce up to 150 upper stages of its New Glenn rocket annually, Blue Origin said in a blog post. "These investments are centered on one goal: building the capacity to support more missions, more reliably, and more efficiently," Ian Richardson, Blue Origin's senior vice president of operations, wrote in the post. "As we look ahead, this infrastructure is designed to support multiple flights per week by the end of the decade." Blue Origin is working to ramp up its launch cadence as it vies to compete with its chief rival, Elon Musk's SpaceX, for commercial and government customers. Blue Origin CEO Dave Limp told CNBC's Morgan Brennan last month that the company's first outside funding round is "oversubscribed." The company had raised $10 billion for the round, valuing it at $140 billion, The Wall Street Journal reported. The company is also recovering from a setback in May, when one of its New Glenn rockets exploded on the launchpad. Blue Origin has been aggressively restoring the launchpad with a goal of returning New Glenn to flight by the end of 2026. As part of the upgrades, Blue Origin said it's building a new customer integration facility with the U.S. Space Force at Cape Canaveral Space Force Station that will enable it to "prepare multiple missions at once" when it's up and running. Blue Origin has invested more than $3 billion in its infrastructure and facilities in Florida, which now spans more than 20 sites across the state's Brevard and Orange counties, with more than 5,000 employees, Richardson said. The space industry is also grappling with a launch capacity shortage, as SpaceX has stopped offering commercial rides on its workhorse Falcon 9 rocket to prioritize its massive Starship rocket. That's spurred a flurry of investment, with $92.5 billion invested in the commercial space sector in the first three quarters of 2026, according to a report this week by venture capital firm Space Capital. Blue Origin, SpaceX and other rocket providers are seeing increasing demand from companies and governments trying to deploy satellites into orbit. Both Blue Origin and SpaceX have their own satellite internet services, and they're launch partners for Amazon, which is in the process of standing up its full Leo low Earth orbit satellite constellation. SpaceX's Starlink currently dominates the market with more than 11,000 satellites in orbit.

The New York Times
Oct 15th, 2026
Space propulsion startup Agile Space opens Seattle-area engineering office to tap regional talent - GeekWire.

Space propulsion startup Agile Space opens Seattle-area engineering office to tap regional talent - GeekWire. by Kurt Schlosser on Oct 15, 2026 at 7:14 amOctober 15, 2026 at 8:02 am Space propulsion company Agile Space Industries is expanding its footprint to the Pacific Northwest, signing a sublease for a new engineering office in Bellevue, Wash. Situated in the Sunset North office complex along Interstate 90, the nearly 5,740-square-foot space will initially house a half-dozen existing employees while scaling up to accommodate an engineering team of 20 to 30 people. The effort is being led by Chief Technology Officer Jake Mills, a former propulsion engineer and crew member at Jeff Bezos' Kent-based Blue Origin space venture. Mills joined Durango, Colo.-based Agile in June and the Bellevue hub will try to tap into more of the Seattle region's deep aerospace talent pool for systems, design, and propulsion engineering. Started in 2009 as Advanced Mobile Propulsion Technologies, Agile specializes in in-space chemical propulsion systems for satellites, lunar landers, and national security missions. Unlike booster rockets that launch payloads off the planet, the company's hardware - including thrusters, propellant tanks, and integrated propulsion systems - takes over once spacecraft reach orbit, navigating everything from commercial constellations to lunar exploration. "The talent pool there, manufacturing capabilities there, customer base there, supply chain based in Seattle, all make it very attractive to go there, and that is the reason we're opening up the engineering office," Mills told GeekWire. Agile joins a bustling Pacific Northwest aerospace cluster anchored by heavyweights like Blue Origin, SpaceX's Starlink engineering operations in Redmond, and a growing wave of startups and orbital logistics companies like Starfish Space. Overall, Agile employs 178 people across the business. The majority of its workforce is based at its Durango headquarters, alongside an additive manufacturing center in Pennsylvania and a 25,000-square-foot test center breaking ground in Tulsa, Okla. The Bellevue office is located at 3120-3180 139th Ave SE. Backed by a $17 million Series A funding round earlier this year, Agile has scaled rapidly, and revenue over the last three years has more than tripled. Investors include Caruso Ventures, Howdy Partners, Lockheed Martin Ventures, Veteran Ventures, Denver Ventures, and Cortado Ventures, among others. Even as Agile plants a flag in the region, the expansion comes amid growing caution over Washington state's business climate. Mills noted that the company shares the same concerns recently voiced by Stoke Space CEO Andy Lapsa - who warned during Seattle Space Week in September that if starting over today, "I'm not sure we'd make the same decision" to build in Washington, given local tax and political pressures. While Agile is eager to tap into the local engineering talent for its Bellevue office, Mills cautioned that future investments, such as a prospective manufacturing and system integration facility, could face headwinds if Washington doesn't match the aggressive incentives and welcoming posture shown by competing states like Oklahoma. "I'm just biased towards the opportunity that when you get all the right people in the right place and you have that competition, you have all the capabilities that you need in one place, great things happen," Mills said. "As people disperse from that, you start to lose that opportunity."