V

Vertiv

Builds power and cooling systems for data centers

Datacenter Site Leader + Thermal + AC Power

Full-TimeUpdated on 10/23/2026
No salary listed
Mid
El Paso, TX, USA+1 moreMore locations: Dallas, TX, USA
In PersonProjects may require long-term field assignments and travel rotations of three consecutive weeks on site followed by one week in the home office.
Field ServiceEquipment Field Service

About the job

Requirements
  • A minimum of two years of experience in industrial construction management is required; equivalent industry experience leading and actively participating in start-up and commissioning of power and/or HVAC equipment, ASEET or ASMET, and six years of military experience in a related field are stated as preferred alternatives or qualifications.
  • Strong organizational skills and the ability to operate independently are required.
  • Strong verbal and written communication skills are required, including the ability to communicate at all organizational levels.
  • The candidate must be able to build and maintain trusting customer relationships and collaborate in high-stress environments.
  • The candidate must respond quickly to changing customer priorities without disruption or resistance.
  • The candidate must be able to read and interpret electrical one-line diagrams and blueprints.
  • The candidate must keep product certifications up to date and meet job requirements, including performance evaluation ratings of meets requirements or better and consistent customer relations.
  • The candidate must be able to evaluate a site immediately, including environmental temperature and general operating conditions, without supervision.
  • The candidate must be able to summarize and report work-related tasks performed and independently evaluate, recognize, and recommend customer solutions based on site evaluation.
  • The candidate must be able to direct technical activities of other technicians, provide on-site customer consultation with Project Leaders, and provide project leadership and on-site direction.
  • Expertise in COHE procedures and site acceptance testing procedures and equipment is required.
  • Computer skills are required, including advanced word processing and report generation, spreadsheet processing, electronic mail, testing equipment and data analysis programs, and familiarity with computer networks.
  • Mechanical aptitude is required.
  • A valid driver's license and emergency deployability are required.
  • The candidate must be able to work flexible schedules, including weekends, evenings, and holidays.
  • The role requires standing, walking, handling tools and components, reaching, stooping, kneeling, crouching, crawling, talking, hearing, smelling, sitting, climbing, and balancing; specific vision abilities include close, distant, color, and peripheral vision, depth perception, and focus adjustment. The candidate must consistently lift up to 50 pounds and occasionally up to 75 pounds.
Responsibilities
  • Provide jobsite construction and technical leadership for large projects involving Vertiv power and/or thermal equipment.
  • Maintain working knowledge of critical infrastructure equipment in data centers, including Vertiv-manufactured equipment.
  • Lead a multidisciplinary on-site team consisting of Project Leaders, Installers, Technicians, Customer Engineers, and subcontractors.
  • Represent Vertiv at daily customer meetings and communicate technical requirements for the day's schedule to coordinate on-site activities with other parties.
  • Lead and support start-up and site testing activities for assigned projects, ensuring sufficient daily manpower and assisting as needed based on manpower availability and site location.
  • Provide daily status reports to Service Management, Project Management, and sales representatives.
  • Maintain current knowledge of Vertiv equipment start-up and commissioning processes, procedures, and tools of the trade, as well as Safety Bulletins, Safety Field Change Notices, Field Change Notices, and Service Tips.
  • Lead daily toolbox talks and pre-job safety walks and inspections, and drive timely corrective and preventive actions.
  • Ensure adherence to all site and Vertiv safety policies, operate according to published safety guidelines, wear required personal protective equipment, follow the 14-hour work-hours rule, and report work-related accidents or injuries within 24 hours.
  • Model safe conduct, use STOP WORK authority, engage in Good Catch activities, and ensure timely closure of corrective and preventive actions.
  • Ensure adherence to the Vertiv warranty process in partnership with the Project Manager.
  • Provide accurate and timely reporting, including timecards, expense reports, mileage reports, service request and task closure, and required forms.
  • Support the Project Manager in obtaining technical data needed to maintain project systems.
  • Maintain company property, including credit cards, personal protective equipment, test equipment, laptop, and smartphone, according to company policies.
  • Communicate with internal and external customers, align customer expectations with Vertiv activities daily, and clarify or realign expectations when needed.
  • Maintain customer satisfaction and productive utilization rates according to company guidelines.
  • Make timely technical and commercial decisions under pressure, following the priorities of safety, quality, timeliness, cost, and productivity.
  • Follow company dress code, safety regulations, start-up and escalation processes, and procedures; lead by example and align conduct with Vertiv behaviors.
  • Communicate with managers, co-workers, Support Services, sales, and others using electronic communications as needed, and help provide a calming effect in stressful customer situations.
  • Work on long-term project assignments, typically lasting four weeks to 12 or more months depending on project scope and schedule.
  • For assignments outside the vicinity of the Site Leader's residence, work a field rotation of three consecutive weeks at the customer site followed by one week of service break in the home office, completing at least 40 hours of billable work and administrative duties during the service-break week.
  • Work at industrial new-construction or retrofit-construction job sites and deploy in emergencies.
Desired Qualifications
  • ASEET or ASMET is preferred.
  • Equivalent industry experience leading and actively participating in start-up and commissioning of power and/or HVAC equipment is preferred.
  • Six years of military experience in a related field is listed as a qualification option.

About the company

Vertiv builds power and cooling equipment that keeps data centers, communication networks, and industrial facilities running through outages and heavy computing loads. Its Liebert cooling systems manage the heat generated by servers, while its power products protect equipment and distribute electricity. The company sells equipment directly and through distributors, then earns additional revenue from installation, maintenance, spare parts, and services throughout the equipment life cycle. Its portfolio also includes racks and software for monitoring and managing IT equipment. Vertiv became a standalone company in 2016 and is headquartered in Westerville, Ohio.

Company Size

10,001+

Company Stage

IPO

Headquarters

Westerville, Ohio

Founded

2016

Get referred to Vertiv

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Sales growth supports expansion: Vertiv reported 24% higher quarterly revenue in July 2026.
  • Ohio career opportunities are planned: Vertiv announced hundreds of additional jobs through 2029 in March 2026.
  • Career planning has a formal structure: Vertiv lists its Career Framework in the employee rewards package.

What critics are saying

  • Large deployments strain delivery: Vertiv reported supply-chain congestion and project timing shifts in July 2026.
  • Booked demand carries cancellation risk: Vertiv's $15 billion December 2025 backlog allows customers to defer or reduce commitments.
  • Job security faces cost targets: Vertiv's ongoing restructuring program includes workforce reductions across all segments.

What makes Vertiv unique

  • Cooling expertise predates the AI boom: Liebert pioneered precision computer room air conditioning in 1965.
  • Modular sites support varied power standards: Vertiv SmartMod integrates factory-tested enclosures with 12V, 48V, or 400V DC.
  • Field support has global scale: Vertiv reports approximately 5,000 service engineers and 320 service centers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Vacation
  • Paid Sick Leave
  • 401(k) Retirement Plan
  • Flexible Work Hours
  • Remote Work Options
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

-1%
Yahoo Finance
Oct 24th, 2026
Vertiv shares fall 39% ahead of Oct 28 earnings as AI delivery faces test

Vertiv (NYSE: VRT) reports third-quarter results on October 28, with investors looking for proof that delayed AI projects are now shipping. Shares have fallen 39% from their first-quarter report price of $319.09 to $194.31, about 29x 2026 consensus EPS. The stock dropped 17.26% after second-quarter results, despite revenue up 24.1% to $3.27 billion and adjusted EPS up 60% to $1.52. Organic growth slowed to 18%, which management blamed on supply chain congestion and project timing. Guidance for the third quarter calls for about 35% organic growth, a 24.5% adjusted operating margin, and $3.75 billion in revenue. Options traders look cautious, with a put/call ratio of 2.54. On October 21, Vertiv said its NVIDIA DSX approach targets up to 30% more cumulative AI token output in the first 12 months.

Yahoo Finance
Oct 22nd, 2026
Vertiv shares fall 8.65% to $193.80 despite model showing 30% more AI output

Vertiv shares fell 8.65% to $193.80 at about 11:46 ET on Thursday, even as the data-centre power and cooling supplier said a new deployment model could speed up AI projects. Using NVIDIA DSX, Vertiv modelled up to 30% more cumulative AI token output in a project's first year. Its scenario cuts design and validation from 30 days to three, and halves infrastructure deployment from 90 days to 45. That yields 317 productive days instead of 245. The gains are modelled, and actual results depend on execution. Polar Data Centers is applying the factory-built approach to the first 41-megawatt phase of its Herya campus in Norway. Vertiv's second-quarter adjusted operating margin was 22.6%, up 410 basis points year over year.

Associated Press
Oct 22nd, 2026
Dassault Systèmes and Vertiv partner to cut AI factory deployment time by up to 50%

Dassault Systèmes and Vertiv Holdings Co. announced a collaboration to let AI factory infrastructure be configured, simulated and validated before construction begins. The companies aim to cut field complexity and speed up deployment of NVIDIA DSX AI factories. Vertiv's SimReady power and cooling designs will run on Dassault Systèmes' 3DEXPERIENCE platform as configurable virtual twins. The work builds on Vertiv's SmartRun twin and extends to solutions such as Vertiv OneCore. The companies target up to 10x faster progress from requirements to a validated design, and up to 50% less deployment time. In Vertiv's model, capacity comes online about 10 weeks sooner, yielding up to 30% more token output within 12 months. The gain comes only from earlier readiness, not a measured customer result. The companies are showing the approach at NVIDIA GTC Berlin, October 20-22.

MarketScreener
Oct 21st, 2026
Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure.

Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure. Published on 10/21/2026 at 08:50 am EDT S&P Capital IQ Vertiv Holdings Co. and NVIDIA introduced an AI factory approach that combines rapid configuration and virtual validation of pre-engineered reference architectures with factory-built deployment. The approach is designed to move AI factories from project kickoff to productive capacity faster and, under defined assumptions, generate up to 30% more cumulative token output within the first 12 months with the same installed capacity. The Vertiv and NVIDIA approach starts instead with pre-engineered AI factory reference architectures that can be rapidly configured to customer and site requirements, virtually validated before deployment, then translated into factory-built infrastructure. Teams can start with pre-engineered AI factory reference designs and rapidly configure them for specific compute, power, cooling and facility requirements in a shared virtual environment. The approach combines the NVIDIA Vera Rubin DSX AI Factory reference design and NVIDIA Omniverse DSX Blueprint, with Vertiv SimReady power and cooling assets, integrated with Dassault Systèmes' 3DEXPERIENCE agentic platform. Rather than developing an integrated infrastructure design from scratch, teams can configure and virtually validate proven reference designs against project requirements, interfaces and constraints. In the modeled scenario, this reduces the time from requirements to a configured and validated AI factory solution from approximately 30 days to three days, a 10x improvement. Vertiv is also contributing SimReady OpenUSD assets of its power and cooling equipment to SimReady Central Library on Hugging Face. The library helps engineering teams discover and reuse validated equipment assets in AI factory digital twins, reducing asset preparation and helping teams evaluate infrastructure options during design. Once the AI factory configuration is validated, Vertiv prefabricated solutions shift more assembly, integration and testing into the factory before equipment reaches the site. These solutions include Vertiv? OneCore, a hybrid-built data center solution that integrates critical power, thermal management and supporting infrastructure, and Vertiv? SmartRun, a prefabricated overhead infrastructure system for high-density power distribution, liquid cooling, networking and containment. By moving more infrastructure work off-site, teams can reduce field complexity and on-site integration requirements. In the modeled scenario, the factory-built approach reduces the infrastructure deployment period from approximately 90 days to 45 days, a reduction of up to 50%. Combined with the faster configuration and validation enabled by pre-engineered reference designs, the modeled approach reduces these stages from approximately 120 days to 48 days. That can make productive AI capacity available about 10 weeks sooner, generating up to 30% more cumulative token output within 12 months of project kickoff with the same installed capacity. (C) S&P Capital IQ - 2026

PR Newswire
Oct 21st, 2026
Vertiv and NVIDIA target 30% more AI token output in year one; Polar deploys 41MW Norway site

Vertiv and NVIDIA have introduced an AI factory approach that pairs pre-engineered reference designs with factory-built infrastructure. Announced at NVIDIA GTC Berlin, it aims to bring AI capacity online sooner. In modelled scenarios, it yields up to 30% more cumulative token output in the first 12 months at the same installed capacity. The modelled approach cuts configuration and validation from about 30 days to three, and deployment from about 90 days to 45. Together, that trims these stages from roughly 120 days to 48, making capacity available about 10 weeks sooner. Polar Data Centers is using the factory-built model for the first 41 MW phase of its AI data center at Herøya, Norway, which is scalable to 100 MW.