G

Genesis

Maps soil health; provides impact data

Principal Subsea Controls Engineer

Contract
No salary listed
Expert
Bachelor's
London, UK+1 moreMore locations: Aberdeen, UK
In Person
Electrical EngineeringControls & Automation Engineering

About the job

Requirements
  • Strong experience in subsea controls design.
  • Good knowledge of subsea controls equipment, umbilicals, interfaces, and key codes and standards.
  • Good knowledge of electrical and hydraulic systems.
  • Full command of English.
  • Computer literacy and competence in Microsoft Office software.
Responsibilities
  • Provide input and expertise in the design, definition, and delivery of subsea control systems through all project phases, including installation, commissioning, and operational support.
  • Define subsea controls equipment, umbilicals, and architecture for concept and Front-End Engineering Design studies, and contribute to selecting options for the initial field layout and architecture.
  • Undertake specialist subsea control system studies for system expansion, life extension, fault finding, and fault rectification.
  • Manage packages for the design, procurement, installation, and commissioning of new systems and equipment.
  • Provide operations support and manage system integrity.
  • Support interface engineering and subsea system engineering and management.
  • Deliver subsea control systems in accordance with project requirements, client design and engineering practices, industry standards and guidelines, and UK regulations.
Desired Qualifications
  • Experience in manufacturing, original equipment manufacturer design, or an offshore environment.
  • Experience working on study projects and contributing to Front-End Engineering Designs, option reviews, and similar activities.
  • Experience delivering, installing, and commissioning subsea control systems.
  • A first degree or equivalent in a relevant engineering discipline, or Chartered Engineer status.
  • Knowledge of high-voltage AC/DC distribution systems and networks.

About the company

Genesis provides soil health and land-use impact data through a SaaS platform, rating soil health on a 0–100 scale. It analyzes land by dividing it into homogeneous zones using topography, geology, and farming practices, with lab analysis (including DNA and carbon) and satellite data to assess impacts like water retention and carbon storage. Farmers contribute data for free, while corporations pay for access to verified data and analytics via dashboards for reporting and decision-making. The goal is to standardize and transparently communicate soil information to improve sustainability across supply chains.

Company Size

11-50

Company Stage

IPO

Headquarters

Paris, France

Founded

2019

Get referred to Genesis

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Moët Hennessy expanded Genesis usage in June 2026 across its Living Soils program.
  • Genesis became a VivaTech 2026 Tech for Change finalist, boosting enterprise credibility.
  • Genesis partners with research, public, and land-survey organizations to standardize soil metrics.

What critics are saying

  • Field sampling and lab analysis create slow, expensive operations; scaling stalls sales cycles.
  • Climate and sustainability suites from Sphera, Salesforce, and ERPs commoditize impact dashboards.
  • If corporate buyers prefer self-reported ESG data, Genesis loses its defensible measurement moat.

What makes Genesis unique

  • Genesis scores soils on 0-100 using samples, satellites, and 35 indicators.
  • Moët Hennessy uses Genesis across vineyards for a simple cross-terroir soil score.
  • Genesis turns pedology into a common language for farmers, brands, and financiers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Hybrid Work Options

Growth & Insights and Company News

6 month growth

-12%

1 year growth

-2%

2 year growth

0%
Energy-Storage.news
Oct 20th, 2026
Genesis opens 200MWh battery storage system at New Zealand's largest power station.

Genesis opens 200MWh battery storage system at New Zealand's largest power station. October 20, 2026 Genesis Energy has officially opened its first grid-scale battery energy storage system (BESS) at Huntly Power Station on New Zealand's North Island. The 100MW/200MWh BESS, which has a 2-hour duration, was opened on 15 October at the Huntly site in the Waikato region. Sized at 1,200MW, Huntly is New Zealand's largest thermal power station and runs on gas and coal. Genesis, a listed New Zealand electricity generator and retailer, said the system was delivered for around NZ$130 million (US$74 million), more than NZ$5 million below budget, claiming this makes it the "cheapest BESS built in New Zealand to date". Saft, the French battery storage manufacturer owned by TotalEnergies, supplied the system's 70 units after Genesis selected it in September 2024 to deliver a turnkey package of lithium iron phosphate (LFP) containers with power conversion and control systems. Northpower, a New Zealand electrical contractor, installed it. The BESS connects directly to the national grid via the Transpower substation at Huntly. Chief operating officer Tracey Hickman said the connection, and the site's proximity to the high-demand centres of Hamilton, Auckland and Tauranga, made Huntly well suited to grid-scale battery storage. Hickman said the BESS adds flexibility to Huntly's role in Genesis's portfolio and will support the electricity system during periods of high demand. "The BESS can be turned on almost immediately, making it the fastest-starting asset at Huntly Power Station," she said. Genesis said in June 2025 that construction had started, describing the project as back-up for the national grid at times of peak demand, particularly on cold winter mornings and evenings, when stored electricity can be released. The opening ceremony was attended by Genesis chief executive Malcolm Johns and Tukoroirangi Morgan, chair of Te Arataura, the executive body of Waikato-Tainui, the iwi (Māori tribal group) of the Waikato region, alongside Craig West, chief executive of Tainui Group Holdings, its commercial arm. Genesis said the BESS forms part of its Gen35 strategy, under which Huntly's role is evolving to provide back-up supply when generation from hydro, wind and solar PV falls short. Hickman said battery storage complements the solar PV plants Genesis is developing, including one at Rangiriri, just north of Huntly. A second BESS of the same size has been approved for Huntly, with construction due to begin in late 2026 and full operation due in 2028. That would bring the site's combined BESS capacity to 200MW/400MWh. It will reuse the land, the grid connection, and the shared plant from the first stage, with Saft again supplying the equipment. Supply margins tighten as gas declines. The Huntly BESS comes online as New Zealand's electricity system faces pressure from a decline in natural gas supply. Huntly, which marked its 40th anniversary last year, is described by Genesis as the cornerstone of its flexible generation portfolio. Transpower, the state-owned company that owns and operates New Zealand's national grid, warned in its draft 2026 Security of Supply Assessment that the national winter energy margin could fall below its lower security standard by 2031, with a 698GWh shortfall, even if committed projects are delivered on schedule. Under a lower gas-supply scenario, Transpower said the breach would occur a year earlier, in 2030. It called for thermal fuel and flexible generation to be secured, including the three Rankine units at Huntly, and for consent-ready projects to be brought forward. Huntly follows two other 100MW/200MWh BESS projects that began operating in New Zealand over the past 18 months. Meridian Energy, the majority state-owned generator and retailer, began commercial operation of its Ruakākā BESS near Whangārei in May 2025, also supplied by Saft.

RNZ (Radio New Zealand)
Aug 27th, 2026
Genesis earnings rise, but profit halves on valuation hit.

Genesis earnings rise, but profit halves on valuation hit. Genesis Energy's normalised operating earnings rose on better retail margins, strong hydro conditions and disciplined fuel management, even as reported profit halved. Key numbers for the year ended June compared with a year ago: * Net profit $85m vs $169m * Revenue $2.8b vs $3.7b * Normalised operating earnings $522m vs $470m * Gross margin $949m vs $864m * Operating free cash flow $322m vs $260m * Net debt $940m vs $1.35b * Debt leverage ratio 1.6 times vs 2.6 times * Final dividend 7.58 cents per share, taking the full-year dividend to 14.88 cents per share Genesis Energy delivered a solid annual result, with normalised operating earnings - known as normalised EBITDAF - rising by 11 percent to $522m, boosted by an $85m lift in gross margin to a record $949m. Revenue fell to about $2.8 billion from $3.7 billion, reflecting lower wholesale electricity volumes and prices, which was partially offset by stronger retail margins and better portfolio management. Net profit fell by 50 percent to $85m, largely because last year's result was boosted by favourable valuation movements, while this year included a large negative fair-value movement. The company recorded a $123m negative fair-value movement on financial instruments, mainly electricity swaps, options and power purchase agreements, compared with a $147m positive movement the year before. Chief executive Malcolm Johns said the results reflected another year of disciplined strategy execution. "Haiti News has continued to improve the quality of its earnings by embedding margin quality, cost discipline and strong capital management into every part of its business, while investing in the capabilities that will support sustainable long-term growth. "We have now positioned our balance sheet for growth, and we are investing around $3b over the next five years in products, services and generation assets," Johns said. Genesis said its $400m capital raise had strengthened the balance sheet, cutting its debt leverage ratio to 1.6 times and helping to fund more investment in solar, battery storage and upgrades at Huntly. The company said construction had started on the 136 megawatt Tihori solar farm near Edgecumbe, while final investment decisions had been made on the Leeston solar farm and the second stage of its grid-scale battery project at Huntly. The first stage of the Huntly battery was due to be fully operational by September. For the 2027 financial year, Genesis forecast normalised EBITDAF of $480m to $520m, and said it had a path to the upper $500m range by 2028. 27 August 2026, 12:17pm

Yahoo Finance
Aug 27th, 2026
Genesis Energy reports record $949M gross margin, cuts debt to $940M

Genesis Energy reported record gross margin of $949 million for FY26, up 10% year-on-year, driven by improved customer netback and lower generation costs. The New Zealand-based energy company posted normalised EBITDAF of $522 million. The company reduced net debt to approximately $940 million following a $400 million equity raise, bringing its debt-to-EBITDAF ratio to 1.6 times. Operating free cash flow reached $322 million, representing a 62% conversion ratio. Genesis declared a final dividend of $0.758 per share, taking the full-year dividend to $0.1488 per share. The company guided FY27 normalised EBITDAF at $480 million to $520 million. Capital expenditure plans include up to $325 million in growth investments for FY27, predominantly for battery and solar developments. The company is progressing its renewable energy portfolio, with the Tihori solar farm under construction and a final investment decision made for the Leeston solar farm.

Yahoo Finance
Aug 26th, 2026
New Zealand power firms post $1B+ profits as consumer bills surge 20%

New Zealand power companies are drawing criticism as household electricity bills surge while firms post record profits. Contact Energy reported NZ$423 million in net profit and NZ$1.011 billion in operating earnings, while Mercury booked NZ$321 million profit. Average power prices rose 12% over one year, then increased another 8% in April. The timing has intensified calls for structural separation of "gentailers" — companies that combine generation and retail operations. Polling by Electric Kiwi and 2Degrees found roughly one in five respondents strongly favour splitting these businesses, with about a third somewhat supporting the move. Critics argue gentailers maintain unfair advantages over competitors whilst households face mounting costs. The Electricity Authority has introduced rules requiring generators to offer hedge contracts to all buyers equally, preventing preferential treatment for their retail divisions.

Genesis Energy
Aug 26th, 2026
Genesis gives green light to $125 million Leeston solar farm.

Genesis gives green light to $125 million Leeston solar farm. Genesis has approved a $125 million investment in its Leeston solar farm in Canterbury, reaching Final Investment Decision (FID) and giving the green light for construction to begin. Construction is due to start by the end of 2026, with generation expected to begin in 2028. Once operational, the 70 MWp solar farm will generate up to 110 GWh of renewable electricity each year, enough to power approximately 13,750 households. The project will be built on a 111-hectare site leased from a farmer, who may continue grazing sheep under the solar panels. Leeston now joins a growing number of Genesis renewable projects moving beyond development and into delivery. It's the latest step in Genesis' strategy to invest $2.2 billion in new renewable generation and battery storage by 2032 to support growing demand from its nearly 500,000 customers and strengthen security of electricity supply as New Zealand transitions to a lower-emissions energy future. Genesis Chief Operating Officer Tracey Hickman said reaching FID for Leeston demonstrates Genesis' commitment to build up to 500 MW of solar generation. "By increasing renewable generation we will free up generation capacity at Huntly Power Station to support energy security for our customers and New Zealand," said Hickman. "We're excited to start building at Leeston, adding to a pipeline of new renewable generation for New Zealand's future." Leeston is one of five solar projects Genesis either has operating or under development. The company's first solar farm at Lauriston in Canterbury, a joint venture with FRV Australia, began generating in 2025. Construction is underway at the Tihori solar farm near Edgecumbe, a site at Rangiriri in the Waikato is progressing towards FID, and the proposed Foxton solar farm recently received fast-track approval. The projects reflect the growing role solar generation is playing in Genesis' future generation mix and investment plans, adding value to the grid scale batteries Genesis is building at Huntly Power Station. "We can capture electricity generated when the sun is shining and demand is lower, and store it in our batteries to discharge when it's most needed during morning and evening demand peaks." Hickman said solar is helping unlock the potential of New Zealand's abundant sunshine, with projects like Leeston demonstrating how that resource can be harnessed at scale. "Leeston is another step forward for our solar programme. With each new project we're turning more of New Zealand's sunshine into renewable electricity and expanding the role solar can play in powering homes, businesses and communities." | Leeston site area | 111 ha | | Expected construction cost* | c $125m ($1.78m / MWp) | | Annual electricity generation | Up to 110 GWh | | MW capacity | 70 MWp | | Expected first generation | 2028 | *Construction cost includes EPC construction, connections, finance and leases through construction and other costs. Media contact. Estelle Sarney External Communications Manager