V

Vertiv

Builds power and cooling systems for data centers

Product Quality Engineer

Full-TimePosted on 10/22/2026
No salary listed
Mid, Senior
Bachelor's
Zagreb, Croatia
In PersonRegular travel within the region to manufacturing sites and project locations; work in Zagreb.
Manufacturing Quality & TestQuality Engineering

About the job

Requirements
  • A university degree in Engineering or another relevant technical discipline is required.
  • At least 3–5 years of experience in Quality, Manufacturing, Engineering, Project Quality, or a similar technical role is required.
  • Good understanding of Quality Management Systems and quality methodologies is required.
  • Experience with Root Cause Analysis (RCA), Corrective and Preventive Actions (CAPA), 8D, PDCA, and problem-solving methodologies is required.
  • Good understanding of manufacturing and project quality processes is required.
  • Good English communication skills are required.
  • Computer literacy, specifically Microsoft Office, is required.
  • Ability to analyze quality data, identify trends, and translate findings into improvement actions is required.
  • Ability to coordinate cross-functional teams across different locations is required.
  • Ability to manage multiple priorities and quality escalations is required.
  • Strong problem-solving and analytical capability is required.
  • Ability to work independently within a regional and cross-functional environment is required.
  • Excellent attention to detail and ability to work accurately in a busy and demanding environment are required.
  • Strong team-working and collaboration skills are required.
Responsibilities
  • Support implementation and continuous improvement of Quality processes and requirements across manufacturing sites and projects within the region.
  • Coordinate and monitor Root Cause Analysis (RCA), Corrective and Preventive Actions (CAPA), 8D, and PDCA activities for major and recurring quality issues, ensuring timely completion and effectiveness of corrective actions.
  • Support investigation and management of major quality issues and escalations, coordinating Plant Quality, Engineering, Supplier Quality, Operations, Project Management, and Site Quality.
  • Monitor regional Quality KPIs and performance trends, identify recurring or systemic issues, and support definition and follow-up of improvement actions.
  • Support standardization and deployment of quality processes, procedures, tools, inspection approaches, and best practices across manufacturing sites and projects.
  • Facilitate lessons learned and knowledge sharing between factories, projects, and relevant functions to prevent recurrence of quality issues.
  • Support manufacturing sites and project teams in resolving complex quality issues and provide regional support where escalation or cross-functional coordination is required.
  • Support project and shipment readiness activities from a Quality perspective, ensuring significant quality risks and open issues are identified, communicated, and appropriately managed before release.
  • Support implementation and effective use of Quality Management Systems and digital Quality tools (eQMS) across the region.
  • Participate in regional quality reviews and provide regular reporting on major quality issues, improvement activities, RCA/CAPA status, and key quality risks.
  • Support preparation and follow-up of internal, customer, and certification audits when regional coordination or support is required.
  • Work closely with Plant Quality Managers, Project/Site Quality, Supplier Quality, Engineering, Operations, and Project/Program Management to align quality activities across the end-to-end process.
  • Perform site and factory visits when required to support major quality issues, audits, project readiness, investigations, or improvement activities.
Desired Qualifications
  • Experience with Quality Management Systems and reporting tools is an advantage.
  • Experience working across multiple manufacturing sites and/or projects.
  • Knowledge of ISO 9001 and relevant Quality Management System requirements.
  • Experience with Lean and Continuous Improvement methodologies.
  • Experience with supplier, manufacturing, and field/site quality processes is an advantage.

About the company

Vertiv builds power and cooling equipment that keeps data centers, communication networks, and industrial facilities running through outages and heavy computing loads. Its Liebert cooling systems manage the heat generated by servers, while its power products protect equipment and distribute electricity. The company sells equipment directly and through distributors, then earns additional revenue from installation, maintenance, spare parts, and services throughout the equipment life cycle. Its portfolio also includes racks and software for monitoring and managing IT equipment. Vertiv became a standalone company in 2016 and is headquartered in Westerville, Ohio.

Company Size

10,001+

Company Stage

IPO

Headquarters

Westerville, Ohio

Founded

2016

Get referred to Vertiv

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Sales growth supports expansion: Vertiv reported 24% higher quarterly revenue in July 2026.
  • Ohio career opportunities are planned: Vertiv announced hundreds of additional jobs through 2029 in March 2026.
  • Career planning has a formal structure: Vertiv lists its Career Framework in the employee rewards package.

What critics are saying

  • Large deployments strain delivery: Vertiv reported supply-chain congestion and project timing shifts in July 2026.
  • Booked demand carries cancellation risk: Vertiv's $15 billion December 2025 backlog allows customers to defer or reduce commitments.
  • Job security faces cost targets: Vertiv's ongoing restructuring program includes workforce reductions across all segments.

What makes Vertiv unique

  • Cooling expertise predates the AI boom: Liebert pioneered precision computer room air conditioning in 1965.
  • Modular sites support varied power standards: Vertiv SmartMod integrates factory-tested enclosures with 12V, 48V, or 400V DC.
  • Field support has global scale: Vertiv reports approximately 5,000 service engineers and 320 service centers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Vacation
  • Paid Sick Leave
  • 401(k) Retirement Plan
  • Flexible Work Hours
  • Remote Work Options
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

-1%
Yahoo Finance
Oct 27th, 2026
Vertiv's free cash flow triples to $925M on customer deposits, yet the stock has fallen 38%

Vertiv's free cash flow hit $925 million in the quarter ended June 30, 2026, up from $277 million a year earlier. Management credits advance payments and milestone collections that customers make on larger data center projects. Over twelve months, free cash flow came to 25.5% of revenue, ahead of Emerson Electric's 18.6%, the highest of the three peers Trefis tracks. Part of that cash is deposits for work not yet delivered. Even so, the stock fell 38.0% from April 27 to October 26, 2026, while the S&P 500 gained 7.6%. It dropped 17.3% on July 29, when Vertiv reported minor revenue delays that management calls timing shifts. Second-quarter revenue rose 24.1% to $3.27 billion. Management raised its 2026 net sales outlook to $14 billion at the midpoint, up 37%, and guided third-quarter sales of $3.75 billion.

Yahoo Finance
Oct 24th, 2026
Vertiv shares fall 39% ahead of Oct 28 earnings as AI delivery faces test

Vertiv (NYSE: VRT) reports third-quarter results on October 28, with investors looking for proof that delayed AI projects are now shipping. Shares have fallen 39% from their first-quarter report price of $319.09 to $194.31, about 29x 2026 consensus EPS. The stock dropped 17.26% after second-quarter results, despite revenue up 24.1% to $3.27 billion and adjusted EPS up 60% to $1.52. Organic growth slowed to 18%, which management blamed on supply chain congestion and project timing. Guidance for the third quarter calls for about 35% organic growth, a 24.5% adjusted operating margin, and $3.75 billion in revenue. Options traders look cautious, with a put/call ratio of 2.54. On October 21, Vertiv said its NVIDIA DSX approach targets up to 30% more cumulative AI token output in the first 12 months.

Yahoo Finance
Oct 22nd, 2026
Vertiv shares fall 8.65% to $193.80 despite model showing 30% more AI output

Vertiv shares fell 8.65% to $193.80 at about 11:46 ET on Thursday, even as the data-centre power and cooling supplier said a new deployment model could speed up AI projects. Using NVIDIA DSX, Vertiv modelled up to 30% more cumulative AI token output in a project's first year. Its scenario cuts design and validation from 30 days to three, and halves infrastructure deployment from 90 days to 45. That yields 317 productive days instead of 245. The gains are modelled, and actual results depend on execution. Polar Data Centers is applying the factory-built approach to the first 41-megawatt phase of its Herya campus in Norway. Vertiv's second-quarter adjusted operating margin was 22.6%, up 410 basis points year over year.

Associated Press
Oct 22nd, 2026
Dassault Systèmes and Vertiv partner to cut AI factory deployment time by up to 50%

Dassault Systèmes and Vertiv Holdings Co. announced a collaboration to let AI factory infrastructure be configured, simulated and validated before construction begins. The companies aim to cut field complexity and speed up deployment of NVIDIA DSX AI factories. Vertiv's SimReady power and cooling designs will run on Dassault Systèmes' 3DEXPERIENCE platform as configurable virtual twins. The work builds on Vertiv's SmartRun twin and extends to solutions such as Vertiv OneCore. The companies target up to 10x faster progress from requirements to a validated design, and up to 50% less deployment time. In Vertiv's model, capacity comes online about 10 weeks sooner, yielding up to 30% more token output within 12 months. The gain comes only from earlier readiness, not a measured customer result. The companies are showing the approach at NVIDIA GTC Berlin, October 20-22.

MarketScreener
Oct 21st, 2026
Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure.

Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure. Published on 10/21/2026 at 08:50 am EDT S&P Capital IQ Vertiv Holdings Co. and NVIDIA introduced an AI factory approach that combines rapid configuration and virtual validation of pre-engineered reference architectures with factory-built deployment. The approach is designed to move AI factories from project kickoff to productive capacity faster and, under defined assumptions, generate up to 30% more cumulative token output within the first 12 months with the same installed capacity. The Vertiv and NVIDIA approach starts instead with pre-engineered AI factory reference architectures that can be rapidly configured to customer and site requirements, virtually validated before deployment, then translated into factory-built infrastructure. Teams can start with pre-engineered AI factory reference designs and rapidly configure them for specific compute, power, cooling and facility requirements in a shared virtual environment. The approach combines the NVIDIA Vera Rubin DSX AI Factory reference design and NVIDIA Omniverse DSX Blueprint, with Vertiv SimReady power and cooling assets, integrated with Dassault Systèmes' 3DEXPERIENCE agentic platform. Rather than developing an integrated infrastructure design from scratch, teams can configure and virtually validate proven reference designs against project requirements, interfaces and constraints. In the modeled scenario, this reduces the time from requirements to a configured and validated AI factory solution from approximately 30 days to three days, a 10x improvement. Vertiv is also contributing SimReady OpenUSD assets of its power and cooling equipment to SimReady Central Library on Hugging Face. The library helps engineering teams discover and reuse validated equipment assets in AI factory digital twins, reducing asset preparation and helping teams evaluate infrastructure options during design. Once the AI factory configuration is validated, Vertiv prefabricated solutions shift more assembly, integration and testing into the factory before equipment reaches the site. These solutions include Vertiv? OneCore, a hybrid-built data center solution that integrates critical power, thermal management and supporting infrastructure, and Vertiv? SmartRun, a prefabricated overhead infrastructure system for high-density power distribution, liquid cooling, networking and containment. By moving more infrastructure work off-site, teams can reduce field complexity and on-site integration requirements. In the modeled scenario, the factory-built approach reduces the infrastructure deployment period from approximately 90 days to 45 days, a reduction of up to 50%. Combined with the faster configuration and validation enabled by pre-engineered reference designs, the modeled approach reduces these stages from approximately 120 days to 48 days. That can make productive AI capacity available about 10 weeks sooner, generating up to 30% more cumulative token output within 12 months of project kickoff with the same installed capacity. (C) S&P Capital IQ - 2026