K

Kanadevia Inova

Designs, builds PtG turnkey plants

Project Manager

Full-TimeUpdated on 10/23/2026
No salary listed
Mid
Knoxville, TN, USA
HybridHybrid arrangement offers up to 2 remote workdays per week.
Architecture & Civil EngineeringConstruction Management

About the job

Requirements
  • Several years of experience in construction of large-scale industrial plants as a construction manager or site manager.
  • Use a well-structured working method and document the assigned scope.
  • Manage several persons with various tasks within an area of activity.
  • Coordinate a wide range of construction activities.
  • Have good market and product knowledge.
  • Have project experience in complex projects.
  • Persuade business partners, including in controversial discussions.
  • Use experience to find a possible way forward, adjust it to circumstances, and implement it.
  • Contribute experience applying standardized methods to identify complex problems.
  • Select and implement solutions.
  • Develop guidelines and requirements within a particular field.
  • Apply skills in particular situations and influence the relevant environment.
Responsibilities
  • With the team, ensure the scope of work is executed in accordance with HSE, quality, schedule, budget, and contractual requirements.
  • Demonstrate commitment to safety and actively implement and promote the project HSE program.
  • Encourage and motivate the site team and contractors to work safely.
  • Be responsible for the safety of the site team and the safety performance of contractors under the role's control.
  • Represent Kanadevia Inova to business partners.
  • Manage supervisor functions within the team.
  • Monitor the construction schedule and develop and implement remedial measures when deviations occur.
  • Review construction progress.
  • Monitor the preparation and provision of construction preparation documents and concepts.
  • Monitor detailed construction planning performed by supervisors and subcontractors.
  • Oversee subcontractor reporting and provide input to site manager reporting.
  • Coordinate and exchange experience with site staff functions and other project teams and departments.
  • Coordinate work performed by subcontractors or other business partners within the scope.
  • Ensure daily and weekly meetings with contractors are held and documented.
  • Verify technical, schedule, and cost change requests; capture lessons learned; and present proposals for decisions to the SM and PCM.
  • Contribute to the preparation and follow-up of deviations and claims.
  • Coordinate intermediate inspections and Mechanical & Electrical Completion tests and TOPs.
  • Understand and comply with HSE requirements relevant to the role.

About the company

Etogas/HZI EtoGas designs and builds turnkey Power-to-Gas plants that convert surplus renewable electricity into storable gases such as green hydrogen and synthetic natural gas. The process starts with electrolysis to split water into hydrogen, which can be used directly or combined with carbon dioxide in a methanation step to produce SNG that works with existing gas infrastructure. The company provides design, construction, service, maintenance, and feasibility and operational studies, with the Werlte Audi e-gas plant as a notable industrial-scale example. After being acquired by Hitachi Zosen Inova, it operates as HZI EtoGas to leverage a global network for large projects, with the goal of supporting grid stability and long-term decarbonization by storing renewable energy as synthetic gas.

Company Size

1-10

Company Stage

Early VC

Total Funding

$7.5M

Headquarters

Stuttgart, Germany

Founded

2007

Get referred to Kanadevia Inova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • The September 14, 2026 BioValue acquisition expands Northern European biomethane scale immediately.
  • Minnesota and Casablanca announcements show Kanadevia Inova winning projects beyond its core DACH market.
  • Bigadan contracts and Sicily's 45.1 GWh plant prove repeat demand for standardized biomethane systems.

What critics are saying

  • Italy's Sicily Biomethan and Minnesota projects depend on permits, interconnections, and commissioning discipline in 2026-2027.
  • BioValue integration in 2026 can distract management and disrupt service quality across 17 plants.
  • If biomethane subsidies tighten in Europe, Kanadevia Inova's project pipeline can stall quickly.

What makes Kanadevia Inova unique

  • Kanadevia Inova pairs proprietary Wet AD technology with EPC, O&M, and asset management.
  • Its September 2026 BioValue deal adds Dutch biomethane operations, engineering, and service depth.
  • The company sells bankable, end-to-end circular-economy plants, not standalone equipment.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Life Insurance
  • Disability Insurance
  • Professional Development Budget

Company News

Kanadevia Inova
Sep 14th, 2026
Kanadevia Inova acquires majority stake in Dutch biogas platform BioValue

Swiss-based greentech leader strengthens its Northern European biogas platform with the strategic acquisition of BioValue, a leading Dutch biomethane developer, operator and service provider.