G

Generac

Home and industrial backup power systems

Compliance Engineering Intern

Summer 2026Updated
No salary listed
Internship
Bachelor's
Waukesha, WI, USA
In PersonOccasional travel to other Generac facilities.
Data & AnalyticsData Management, Data Engineering

About the job

Requirements
  • Currently pursuing a BS degree in Engineering (preferably in Mechanical, Electrical, Industrial, Environmental, Chemical or Civil Engineering)
Responsibilities
  • Review and validate product certifications and regulations
  • Develop and implement certification record system in the PLM (windchill) system
  • Assist in development of compliance training modules
  • Research and update compliance notes on critical component drawings, work with remote design center for updates
  • Collect and create a real-time end of line compliance data lake for product validation
  • Provide certification and compliance support in the Industrial, Commercial, Residential and/or Retail products Including reviewing certification plans for completeness and relevance to projects requirements. Interfacing with internal company personnel, Provide technical support for assigned projects.
  • Collaborate with internal manufacturing partners, contract manufacturers, designers and product specialists to optimize compliance process.
  • Support compliance team goal initiatives
  • Travel to other Generac facilities as necessary
  • Other duties as assigned
Desired Qualifications
  • Pursuing BS degree in Mechanical, Electrical, Industrial, Environmental, Chemical or Civil Engineering
  • Completion of at least Freshman year of education
  • Understanding or working knowledge of Pro-E and/or AutoCAD experience, preferred
  • Understanding of a Product Lifecycle Management (windchill) system

About the company

Generac Power Systems provides backup power solutions for homes and businesses by selling generators and related equipment, including home standby units, portable generators, clean energy products, and accessories. These systems are designed to automatically supply electricity during outages and can be monitored remotely, with maintenance services offered to keep them running. The company differentiates itself through a broad dealer network, direct and partner sales, and a diverse product lineup that covers residential, commercial, and industrial power needs, along with a focus on sustainability. Its goal is to ensure reliable power availability across various sectors by making backup and clean energy solutions accessible, scalable, and easy to monitor.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Waukesha, WI

Founded

1959

Get referred to Generac

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Amazon expects $2.4 billion of deliveries in 2027-2028, per September 16 filing.
  • Generac reported $1.6 billion data-center backlog in July 2026.
  • Second-quarter 2026 C&I sales rose 29% to $556 million.

What critics are saying

  • The Amazon warrant caps upside: 1.69 million shares and 2033 expiration.
  • EEOC's September 30, 2026 settlement forces policy revisions and training after Title VII violations.
  • Generac's data-center boom depends on one customer, making Amazon concentration an existential risk.

What makes Generac unique

  • September 16, 2026 Amazon deal locked Generac into data-center backup power supply.
  • Generac's vertically integrated large-megawatt manufacturing differentiates it from commodity generator assemblers.
  • Its residential dealer network still throws off cash while C&I scales faster.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Professional Development Budget
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

1%

1 year growth

8%

2 year growth

9%
جريدة البلاد
Nov 1st, 2026
Tamkeen supports a quality industrial investment to attract electrical generator manufacturing to Bahrain in partnership with "Generac Al-Juffali Generators"

Tamkeen supports a quality industrial investment to attract electrical generator manufacturing to Bahrain in partnership with "Generac Al-Juffali Generators" Sunday, 1 November 2026 The Labour Fund "Tamkeen" announced the signing of an agreement with "Generac Al-Juffali Generators" to support its investment project in the Kingdom of Bahrain, represented by establishing a specialized factory for assembling and manufacturing diesel-powered electrical generators, contributing to enhancing local manufacturing capabilities and supporting the growth of the industrial sector, on the sidelines of the Gulf Gateway Forum 2026. This agreement comes within the framework of Tamkeen's continuous efforts aimed at supporting quality partnerships with leading regional and global companies that contribute to developing priority economic sectors and enhancing manufacturing capabilities in the Kingdom, in addition to benefiting from specialized global and regional expertise in a way that supports the growth of the industrial sector, enhances its competitiveness, and contributes to creating quality job opportunities for national talent. Commenting on this, Her Excellency Mrs. Maha Abdul Hamid Mufeez, Chief Executive Officer of the Labour Fund "Tamkeen", said: "This project represents a model for the quality projects that Tamkeen seeks to support due to their impact on enhancing the growth of priority economic sectors. The manufacturing sector is one of the vital sectors supporting the national economy, given its pivotal role in enhancing productivity, creating added value and supporting economic diversification. This initiative also represents a model for investments that combine attracting global expertise and developing Bahraini competencies, contributing to transferring specialized industrial knowledge and enhancing the readiness of national talent to participate in advanced industries. Through these partnerships, we continue to support projects that create quality job opportunities for national talent, contribute to developing their expertise and skills, enhance the competitiveness of the national economy and consolidate the private sector's contribution to sustainable economic development." For his part, Mr. Paolo Campinoti, President of International Development at Generac, expressed his pride in this partnership in the Kingdom of Bahrain, which represents an important step in the company's journey toward strengthening its regional presence and expanding the scope of its cooperation in the region, noting that the project reflects confidence in the promising potential provided by the Kingdom and its supportive business environment, and also embodies the partners' commitment to building long-term cooperation that contributes to achieving added value and supporting industrial and economic growth in Bahrain and the region. "Generac Al-Juffali Generators" is a joint venture between Generac Holdings, one of the world's leading companies in backup power solutions and systems and electrical generators, and Al-Juffali Group, one of the largest family groups in Saudi Arabia and the region, which has a broad presence in the industry, energy, infrastructure and transportation sectors. The project includes establishing a specialized factory for assembling and manufacturing diesel-powered electrical generators in the Kingdom of Bahrain with an annual production capacity of up to 250 units, enhancing local manufacturing capabilities and making Bahrain a center to serve regional markets. The project also combines Generac's global technical expertise and Al-Juffali Group's strong regional presence, contributing to attracting quality foreign direct investment and transferring specialized industrial knowledge and expertise to the Kingdom. The company also invested in developing national competencies by benefiting from specialized technical training opportunities for 8 Bahraini employees in Italy in the fields of manufacturing and operations, with support from the Labour Fund "Tamkeen", supporting the transfer of advanced industrial knowledge and building qualified national capabilities to contribute to the growth of the industrial sector. This support comes in line with Tamkeen's strategic priorities for 2026, which focus on areas with the highest return for the economy and Bahrainis, contributing to launching initiatives that link skills with available job opportunities in the market, adopting an innovative approach to stimulate private sector growth and financing, in addition to developing mechanisms, enhancing governance and institutional culture at the Fund, with the aim of enhancing the level of support provided to enterprises and maximizing their contribution to the private sector by improving their performance.

Inspenet
Oct 28th, 2026
Generac maintains its sales forecasts for 2026.

Generac maintains its sales forecasts for 2026. Following the third-quarter results, Generac maintained its growth expectations for the full year 2026, the company continues to project net sales growth of between 15% and 19% compared to the previous year. The main update came in its profitability forecasts, the company raised the lower limit of the expected adjusted EBITDA margin, which now stands between 20.5% and 21%, compared to the previous range of 20% to 21%. On the other hand, the net profit margin forecast remains unchanged, between 9% and 10% for the end of the year. With an expanding industrial order book and a recovery in its residential business, Generac faces the final months of 2026 with growth prospects. Looking ahead to 2027 and 2028, one of its main challenges will be to increase production and meet supply commitments to data center operators, a market that is gaining importance within its business. Verified Author Analyst and writer of news specialized in industrial technology, with a solid background in engineering. My work focuses on curating and synthesizing complex information, transforming technical advances and regulatory changes into journalistic reports.

Yahoo Finance
Oct 21st, 2026
Generac could jump 50% as analysts back its $8B Amazon data centre generator deal

Generac (GNRC), a maker of backup power systems long tied to hurricane demand, is winning business from AI data centres. Last month it signed a deal worth up to $8 billion to supply backup generators to Amazon's data centres. The first $2.4 billion of deliveries will come next year and in 2028. Generac's sales were $4.2 billion last year. It also holds a $1.6 billion data centre backlog, bringing its data centre work to about $4 billion. Analysts have raised price targets, including Canaccord to $375, Stifel to $290, and JPMorgan to $265. The mean target of $288.95 implies a gain of about 50% over 12 months. Citi cut its target from $300 to $232. The stock remains down over 60% from its 2021 peak.

Yahoo Finance
Oct 13th, 2026
Rocket Lab ($39.3B) is a buy; Titan International and Generac are industrials stocks to avoid

StockStory named one industrials stock to buy and two to avoid, as the sector has fallen 6.4% over six months while the S&P 500 gained 13.5%. Its top pick is Rocket Lab (NASDAQ:RKLB), with a market cap of $39.32 billion. Revenue grew 53.4% annually over two years, cash burn has fallen, and returns on capital are rising. The shares trade at $65.26. It would sell Titan International (NYSE:TWI), valued at $442.1 million. Revenue growth was 1.7% annually, and its net-debt-to-EBITDA ratio of 5× could force dilutive equity offerings. It also advises against Generac (NYSE:GNRC), valued at $12.9 billion. Sales grew 5.1% annually, operating margin fell 6.7 percentage points over five years, and earnings per share shrank 1.9% annually.

The Northwestern
Oct 2nd, 2026
Oshkosh Plan Commission to review Pioneer Island plans and more Oct. 6.

Oshkosh Plan Commission to review Pioneer Island plans and more Oct. 6. Commissioners will consider a Pioneer Island restaurant and amphitheater, downtown ice cream and mini golf, and a Generac storage expansion. Oshkosh Northwestern Oct. 2, 2026, 4:59 a.m. CT * The Oshkosh Plan Commission is set to review a major development proposal for Pioneer Island. * Plans for the island include a new restaurant, an amphitheater and expanded outdoor entertainment areas. * A separate proposal seeks to add an ice cream parlor and a nine-hole miniature golf course downtown. * Generac Power Systems is also requesting an expansion of its outdoor storage at its manufacturing campus. OSHKOSH - The Oshkosh Plan Commission will consider plans for a new restaurant and expanded outdoor entertainment on Pioneer Island when it meets at 4 p.m. Oct. 6. The commission is being asked to recommend approval of the general development plan for 1000 Pioneer Drive. It also will act on an ice cream parlor and miniature golf proposal downtown and an outdoor storage expansion at the Generac Power Systems campus. Restaurant, entertainment venue proposed for Pioneer Island. The 6.3-acre site at 1000 Pioneer Drive could add a restaurant, outdoor seating and games, an amphitheater, an event space and a wharf under a proposal from Pioneer Island LLC. The first phase would add a support building with permanent restrooms, a walk-in cooler and storage for the existing tiki bar, along with improved outdoor seating and activity areas. Later phases would include a 10,097-square-foot restaurant, a permanent event structure, an amphitheater and a new parking lot. The full development would provide 341 parking spaces, 19 fewer than required by code. The applicant points to 60 on-street spaces on Pioneer Drive, pedestrian access and 28 boat slips as additional options. City staff supports the plan and recommends that detailed zoning exceptions be addressed during later specific implementation plan reviews. Special event permits would be required when determined by the city's special events coordinator. Ice cream parlor, patio and mini golf planned on Waugoo Avenue. A two-story building constructed in 1875 at 13 Waugoo Ave., next to Reimer Jewelers, could gain an ice cream parlor on its first floor, a covered patio and an accessible ramp. The second floor would remain residential. The adjacent vacant lot at 15 Waugoo Ave. would become a nine-hole miniature golf course, with customers paying inside the ice cream parlor. The applicant plans to combine the two parcels. Proposed exterior work includes repainting the wood storefront black, adding glass-and-black-aluminum overhead doors on the front and east sides, and building a wood-and-metal roof over the patio. A neighboring property owner raised a concern about keeping an emergency exit facing the patio and golf area unobstructed. City staff recommends approval, finding the changes compatible with the downtown setting. Generac seeks outdoor storage expansion. Generac Power Systems is requesting approval to add about 60,326 square feet of outdoor storage at its 22.6-acre manufacturing campus at 3815 Oregon St. The company wants an 8-foot chain-link fence with privacy slats to secure the site's south entrances and screen stored wood dunnage and large frames. The plan requires exceptions allowing the fence in the front yard and reducing the south setback from 30 feet to 15 feet. No new pavement, lighting or façade changes are proposed. The landscaping plan would preserve existing vegetation and add plantings for a total of 1,095 landscaping points, exceeding the roughly 603 points required. City staff recommends approval with conditions covering the reduced setback, taller fence and final landscaping review. How to attend or watch the meeting. The Plan Commission will meet at 4 p.m. Oct. 6 in Room 406 at Oshkosh City Hall, 215 Church Ave. Viewers can watch through the Oshkosh Media GovTV livestream, Spectrum Cable Channel 10, AT&T U-verse Channel 99 or the Oshkosh Media apps on Roku, Amazon Fire TV and Apple TV.

INACTIVE