V

Vertiv

Builds power and cooling systems for data centers

ERS-NETA Supervisor

Full-TimeUpdated
No salary listed
Senior, Expert
Bachelor's
Dallas, TX, USA
In PersonFieldwork is regular; travel required up to 50%, including out-of-town and international travel for several weeks.
Electrical EngineeringPower Systems Engineering
No H1B Sponsorship

About the job

Requirements
  • Strong knowledge of the National Electrical Code and industry standards including Occupational Safety and Health Administration and National Fire Protection Association standards.
  • Specialized skills in most of the following areas: power quality surveys; generation and co-generation startup; American National Standards Institute, National Electrical Code, National Electrical Manufacturers Association, and Underwriters Laboratories specifications and field evaluation; pilot wire and distance relaying; computer power system transient surveys; vector and phasor analogy; uninterruptible power supply systems; drive systems; complex control systems; medium- and high-voltage substation startup; and vibration analysis.
  • Strong background and experience in all types of switchgear and equipment testing through the 500-kV class.
  • Thorough knowledge of electrical apparatus testing and a strong theoretical understanding of electrical power systems, with aptitude for problem evaluation.
  • Communication, supervisory, organizational, and management skills.
  • Ability to communicate effectively, verbally and in writing, with clients, peers, and management.
  • Good judgment, dependability, technical expertise supervising large-scale projects, and business management skills.
  • Strong computer skills, including editing, formatting, and using templates in Microsoft Word; using the Internet for standards, products, and manufacturer research; and operating computer-controlled test equipment.
  • Willingness to work flexible hours, weekends, holidays, and nights, and availability for out-of-town and international travel for up to several weeks.
  • Ability to meet the physical demands, including regularly standing, walking, using hands and fingers, handling or feeling objects, tools, or controls, reaching, stooping, kneeling, crouching, crawling, talking, hearing, and smelling; frequently sitting, climbing, and balancing; close and distance vision, basic color differentiation, and focus adjustment; regularly lifting or moving up to 25 pounds and frequently lifting or moving 100-pound test sets.
  • Valid driver's license.
  • One of the following education and experience pathways: Graduate Engineer with a Bachelor of Science in Electrical Engineering or Bachelor of Science in Mechanical Engineering and six years of experience; graduate of an applicable electrical technical school or military equivalent and at least nine years of same or similar work experience; or high school education or equivalent and at least ten years of same or similar work experience.
  • NETA 3 Certification or equivalent experience.
  • Ability to pass a pre-employment drug test, background check, and motor vehicle records check.
  • Ability to meet physical requirements including medium lifting (30–45 pounds), heavy lifting (over 50 pounds), frequent standing, kneeling, crawling, stooping, bending, twisting, climbing stairs or ladders, and driving.
  • Ability to work in extreme cold and heat, medium/high noise, around moving machinery, and outdoors without effective weather protection; required protective equipment includes earplugs, gloves, eyewear, respirator, or mask.
  • Legally authorized to work in the United States; individuals who require sponsorship for work authorization now or in the future are not eligible.
Responsibilities
  • Perform supervisory, sales, and administrative duties in a small-area service center or designated scope of a larger service center while regularly performing fieldwork.
  • Provide technical support to a region of service engineers.
  • Supervise, train, and assist field service engineers and technicians, and be responsible for all aspects of field service work in the area.
  • Perform complex troubleshooting, specialized tests, inspections, and appraisals on electrical apparatus and electrical systems.
  • Lead large projects requiring specialized skills, including generator acceptance tests, commissioning larger substations, supervising turnkey projects, detailed power surveys, and other electrical consultation.
  • Develop tests and inspections in new areas of field services.
  • Perform job estimating, proposal preparation, fieldwork, scheduling, report preparation, and billing.
  • Write complete, detailed reports promptly at the end of projects using a computer, and accurately process job billing.
  • Perform complex analysis and evaluative tasks for equipment-labeling projects consistent with recognized industry and international standards, local jurisdiction requirements, and company procedures.
  • Participate actively in client interface and business development activities.
  • Prepare technical presentations and articles as required.
  • Travel for work, with travel time required of 50%.

About the company

Vertiv builds power and cooling equipment that keeps data centers, communication networks, and industrial facilities running through outages and heavy computing loads. Its Liebert cooling systems manage the heat generated by servers, while its power products protect equipment and distribute electricity. The company sells equipment directly and through distributors, then earns additional revenue from installation, maintenance, spare parts, and services throughout the equipment life cycle. Its portfolio also includes racks and software for monitoring and managing IT equipment. Vertiv became a standalone company in 2016 and is headquartered in Westerville, Ohio.

Company Size

10,001+

Company Stage

IPO

Headquarters

Westerville, Ohio

Founded

2016

Get referred to Vertiv

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Sales growth supports expansion: Vertiv reported 24% higher quarterly revenue in July 2026.
  • Ohio career opportunities are planned: Vertiv announced hundreds of additional jobs through 2029 in March 2026.
  • Career planning has a formal structure: Vertiv lists its Career Framework in the employee rewards package.

What critics are saying

  • Large deployments strain delivery: Vertiv reported supply-chain congestion and project timing shifts in July 2026.
  • Booked demand carries cancellation risk: Vertiv's $15 billion December 2025 backlog allows customers to defer or reduce commitments.
  • Job security faces cost targets: Vertiv's ongoing restructuring program includes workforce reductions across all segments.

What makes Vertiv unique

  • Cooling expertise predates the AI boom: Liebert pioneered precision computer room air conditioning in 1965.
  • Modular sites support varied power standards: Vertiv SmartMod integrates factory-tested enclosures with 12V, 48V, or 400V DC.
  • Field support has global scale: Vertiv reports approximately 5,000 service engineers and 320 service centers.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Vacation
  • Paid Sick Leave
  • 401(k) Retirement Plan
  • Flexible Work Hours
  • Remote Work Options
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

-1%
Yahoo Finance
Oct 27th, 2026
Vertiv's free cash flow triples to $925M on customer deposits, yet the stock has fallen 38%

Vertiv's free cash flow hit $925 million in the quarter ended June 30, 2026, up from $277 million a year earlier. Management credits advance payments and milestone collections that customers make on larger data center projects. Over twelve months, free cash flow came to 25.5% of revenue, ahead of Emerson Electric's 18.6%, the highest of the three peers Trefis tracks. Part of that cash is deposits for work not yet delivered. Even so, the stock fell 38.0% from April 27 to October 26, 2026, while the S&P 500 gained 7.6%. It dropped 17.3% on July 29, when Vertiv reported minor revenue delays that management calls timing shifts. Second-quarter revenue rose 24.1% to $3.27 billion. Management raised its 2026 net sales outlook to $14 billion at the midpoint, up 37%, and guided third-quarter sales of $3.75 billion.

Yahoo Finance
Oct 24th, 2026
Vertiv shares fall 39% ahead of Oct 28 earnings as AI delivery faces test

Vertiv (NYSE: VRT) reports third-quarter results on October 28, with investors looking for proof that delayed AI projects are now shipping. Shares have fallen 39% from their first-quarter report price of $319.09 to $194.31, about 29x 2026 consensus EPS. The stock dropped 17.26% after second-quarter results, despite revenue up 24.1% to $3.27 billion and adjusted EPS up 60% to $1.52. Organic growth slowed to 18%, which management blamed on supply chain congestion and project timing. Guidance for the third quarter calls for about 35% organic growth, a 24.5% adjusted operating margin, and $3.75 billion in revenue. Options traders look cautious, with a put/call ratio of 2.54. On October 21, Vertiv said its NVIDIA DSX approach targets up to 30% more cumulative AI token output in the first 12 months.

Yahoo Finance
Oct 22nd, 2026
Vertiv shares fall 8.65% to $193.80 despite model showing 30% more AI output

Vertiv shares fell 8.65% to $193.80 at about 11:46 ET on Thursday, even as the data-centre power and cooling supplier said a new deployment model could speed up AI projects. Using NVIDIA DSX, Vertiv modelled up to 30% more cumulative AI token output in a project's first year. Its scenario cuts design and validation from 30 days to three, and halves infrastructure deployment from 90 days to 45. That yields 317 productive days instead of 245. The gains are modelled, and actual results depend on execution. Polar Data Centers is applying the factory-built approach to the first 41-megawatt phase of its Herya campus in Norway. Vertiv's second-quarter adjusted operating margin was 22.6%, up 410 basis points year over year.

Associated Press
Oct 22nd, 2026
Dassault Systèmes and Vertiv partner to cut AI factory deployment time by up to 50%

Dassault Systèmes and Vertiv Holdings Co. announced a collaboration to let AI factory infrastructure be configured, simulated and validated before construction begins. The companies aim to cut field complexity and speed up deployment of NVIDIA DSX AI factories. Vertiv's SimReady power and cooling designs will run on Dassault Systèmes' 3DEXPERIENCE platform as configurable virtual twins. The work builds on Vertiv's SmartRun twin and extends to solutions such as Vertiv OneCore. The companies target up to 10x faster progress from requirements to a validated design, and up to 50% less deployment time. In Vertiv's model, capacity comes online about 10 weeks sooner, yielding up to 30% more token output within 12 months. The gain comes only from earlier readiness, not a measured customer result. The companies are showing the approach at NVIDIA GTC Berlin, October 20-22.

MarketScreener
Oct 21st, 2026
Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure.

Vertiv Holdings Co. and NVIDIA introduce AI Factory approach using NVIDIA DSX and Vertiv factory-built infrastructure. Published on 10/21/2026 at 08:50 am EDT S&P Capital IQ Vertiv Holdings Co. and NVIDIA introduced an AI factory approach that combines rapid configuration and virtual validation of pre-engineered reference architectures with factory-built deployment. The approach is designed to move AI factories from project kickoff to productive capacity faster and, under defined assumptions, generate up to 30% more cumulative token output within the first 12 months with the same installed capacity. The Vertiv and NVIDIA approach starts instead with pre-engineered AI factory reference architectures that can be rapidly configured to customer and site requirements, virtually validated before deployment, then translated into factory-built infrastructure. Teams can start with pre-engineered AI factory reference designs and rapidly configure them for specific compute, power, cooling and facility requirements in a shared virtual environment. The approach combines the NVIDIA Vera Rubin DSX AI Factory reference design and NVIDIA Omniverse DSX Blueprint, with Vertiv SimReady power and cooling assets, integrated with Dassault Systèmes' 3DEXPERIENCE agentic platform. Rather than developing an integrated infrastructure design from scratch, teams can configure and virtually validate proven reference designs against project requirements, interfaces and constraints. In the modeled scenario, this reduces the time from requirements to a configured and validated AI factory solution from approximately 30 days to three days, a 10x improvement. Vertiv is also contributing SimReady OpenUSD assets of its power and cooling equipment to SimReady Central Library on Hugging Face. The library helps engineering teams discover and reuse validated equipment assets in AI factory digital twins, reducing asset preparation and helping teams evaluate infrastructure options during design. Once the AI factory configuration is validated, Vertiv prefabricated solutions shift more assembly, integration and testing into the factory before equipment reaches the site. These solutions include Vertiv? OneCore, a hybrid-built data center solution that integrates critical power, thermal management and supporting infrastructure, and Vertiv? SmartRun, a prefabricated overhead infrastructure system for high-density power distribution, liquid cooling, networking and containment. By moving more infrastructure work off-site, teams can reduce field complexity and on-site integration requirements. In the modeled scenario, the factory-built approach reduces the infrastructure deployment period from approximately 90 days to 45 days, a reduction of up to 50%. Combined with the faster configuration and validation enabled by pre-engineered reference designs, the modeled approach reduces these stages from approximately 120 days to 48 days. That can make productive AI capacity available about 10 weeks sooner, generating up to 30% more cumulative token output within 12 months of project kickoff with the same installed capacity. (C) S&P Capital IQ - 2026