Simplify Logo
Vertiv

Vertiv

Designs, manufactures, and services critical infrastructure

AME-End of Line Deployment Engineer

Full-Time
No salary listed
Expert
Bachelor's
Mumbai, Maharashtra, India
Hybrid

Requires up to 25% travel; on-site work in Ambernath, India.

About the job

Requirements
  • Deployment & Automation Expertise: Proven ability to manage large-scale equipment installations and PLC/Automation startups in an international environment.
  • OT Stack Proficiency: Hands-on experience deploying Inductive Automation Ignition, Microsoft Power Apps, and Power Automate within a manufacturing context.
  • Smart Hardware Integration: Expert knowledge of integrating DC Torque tools, OT gateways, and Industrial Tablets into a production line.
  • Operational Line Balancing: Advanced proficiency in Takt time optimization and Work Content Graphing using digital data collection tools.
  • Simulation Application: Ability to use Discrete Event Simulation outputs to optimize the placement of automation and the configuration of digital workflows.
  • Bilingual Proficiency: Professional fluency in English and Spanish to facilitate communication with regional engineering teams and local factory staff.
  • Education: Bachelor’s degree in Industrial Engineering, Manufacturing Engineering, Systems Engineering, or Mechanical/Electrical Engineering.
  • Experience: Minimum of 15+ years of hands-on experience in manufacturing deployment or plant engineering, specifically with power products or high-complexity electronics.
Responsibilities
  • On-Site Process & OT Deployment: Lead the physical installation of manufacturing lines, integrating OT devices and Automation into a unified factory ecosystem. Orchestrate the rollout of Ignition Perspective HMI and Microsoft Power Apps to provide shop-floor operators with real-time digital work instructions and performance dashboards.
  • Smart Tooling & IoT Integration: Direct the deployment and calibration of DC Torque tools and smart sensors. Ensure these devices are networked to capture granular assembly data to feed directly into the Digital Twin and Quality Management Systems.
  • Factory-Level Yamazumi Execution: Validate and refine Yamazumi modeling on the shop floor. Utilize Tablets and mobile devices to conduct live work content graphing, ensuring the synchronization of manual labor with automated machine cycles to meet Takt time targets.
  • Digital-to-Physical Validation: Use Discrete Event Simulation data to guide the layout of automation cells and material handling. Verify that the physical throughput and data latency of networked OT devices match simulation predictions, neutralizing bottlenecks during the deployment phase.
  • Full Line Balancing & Tablet-Based SOPs: Synchronize all factory processes, deploying Tablets at each workstation to replace paper-based systems. Ensure a seamless data flow between automated cells and manual enclosure integration through integrated Power Automate workflows.
  • Equipment & Automation Commissioning: Oversee the validation (IQ/OQ/PQ) of manufacturing equipment, including robotics, conveyors, and testing protocols. Ensure all OT infrastructure is robust, secure, and fully communicative with the broader MES/ERP environment.
  • Digital Handoff & Hyper-care: Lead the creation of digital Standard Operating Procedures (SOPs). Act as the primary technical lead during the launch hyper-care period, troubleshooting both physical mechanical issues and digital logic gaps in the Ignition/Power App interface.
  • Cross-Functional Factory Alignment: Collaborate with IT, Plant Managers, and Supply Chain to ensure the factory’s network infrastructure supports high-density IoT and mobile tablet connectivity required for new deployments.
Desired Qualifications
  • Six Sigma Black Belt or Lean Certification is highly desirable.

About the company

Vertiv designs, manufactures, and services critical digital infrastructure for data centers, networks, and facilities, including UPS, power distribution, switchgear, cooling (including liquid cooling for AI workloads), and racks, along with modular data centers and monitoring software. It provides end-to-end hardware and software to keep IT running, with services for installation, maintenance, lifecycle support, and consulting. Its broad, mature portfolio and global service network, rooted in the Liebert and Emerson heritage, let it offer integrated end-to-end solutions rather than just hardware. The goal is to help operators scale compute capacity while improving resilience, density, and energy efficiency to support the data economy.

Company Size

10,001+

Company Stage

IPO

Headquarters

Westerville, Ohio

Founded

2012

Get referred to Vertiv

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Vertiv raised 2026 guidance to $14 billion sales and $6.65-$6.75 adjusted EPS.
  • Q2 2026 revenue grew 24%, and adjusted free cash flow reached $925 million.
  • SGC Energy picked Vertiv for Gunsan's 300MW AI campus, energized in Q1 2028.

What critics are saying

  • Vertiv missed Q2 2026 revenue after supply-chain congestion and multistage project timing delays.
  • Schneider Electric sued Vertiv in July 2026, while Vertiv sued nVent over patents.
  • AI-campus delays can strand Vertiv's $15 billion backlog and inflate the $1.45 billion UIG deal.

What makes Vertiv unique

  • Vertiv combines Liebert heritage, global service reach, and integrated power-cooling systems.
  • PowerNexus bundles UPS and switchgear into one block, cutting deployment time 70%.
  • UIG acquisition moves Vertiv upstream into grid interconnects, microgrids, and onsite generation.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Paid Vacation

Paid Sick Leave

401(k) Retirement Plan

Flexible Work Hours

Remote Work Options

Hybrid Work Options

Wellness Program

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-3%

2 year growth

0%
Yahoo Finance
Sep 11th, 2026
Vertiv stock poised to rebound despite 30% dip from 52-week high

Vertiv Holdings shares have risen 109% over the past year, though they've recently pulled back 30% from their May highs. The AI infrastructure company manufactures power and thermal management equipment for data centers. The company reported strong second-quarter results, with revenue increasing 24% year-over-year to $3.27 billion and adjusted earnings jumping 60% to $1.52 per share. Adjusted free cash flow surged 234% to $925 million. Vertiv expects $14 billion in revenue for 2026, representing 37% growth from 2024. The company projects adjusted earnings per share of $6.70 for 2026, up 60% at the mid-point. Market tailwinds remain strong. Liquid-cooling systems in data centers are projected to grow at 26% annually through 2033, whilst Goldman Sachs predicts data center power demand could increase 170% between 2025 and 2030, supporting demand for Vertiv's power solutions.

Yahoo Finance
Sep 9th, 2026
Eaton vs. Vertiv: Which power management stock wins as infrastructure demand surges?

Eaton and Vertiv are competing for investor attention as infrastructure demand grows globally. Eaton, a diversified power management giant, operates across aviation, housing, and electrical markets in over 160 countries. In 2025, it generated $27 billion in revenue, up 10% year-on-year, with net income of $4 billion and a 15% net margin. Its debt-to-equity ratio stands at 0.5x. Vertiv focuses on critical digital infrastructure, supplying power and cooling technologies to hyperscale cloud providers. The company reported 2025 revenue of $10.2 billion, up 27.7%, with net income of $1.3 billion. Its net margin nearly doubled to 13% since 2023. Vertiv maintains a $15 billion backlog and a debt-to-equity ratio of 0.8x.

Yahoo Finance
Sep 8th, 2026
Vertiv targets $20B+ revenue by 2030 on AI infrastructure boom

Vertiv Holdings, a provider of AI infrastructure including power and cooling systems, generated $10.2 billion in net sales in 2025. The company expects 2026 sales between $13.8 billion and $14.2 billion, requiring only 13.5% annual revenue growth through 2029 to double its 2025 figures. Management targets 20% to 22% organic annual sales growth from 2025 through 2030, aiming for roughly $26 billion revenue in 2030. Vertiv exited 2025 with $15 billion in backlog, though orders can be cancelled or rescheduled. The company faces execution risks. Second-quarter 2026 revenue rose 24% year-over-year, but supply chain issues and project timing delayed some sales. Vertiv is expanding manufacturing capacity across power systems, integrated infrastructure and cooling to meet demand as AI data centres become harder to power and cool with rising computing density.

Data Center Dynamics
Sep 8th, 2026
SGC Energy partners with Vertiv to deploy PowerNexus at planned AI data center in Gunsan, South Korea.

SGC Energy partners with Vertiv to deploy PowerNexus at planned AI data center in Gunsan, South Korea. Expected to be energized in 2028 September 08, 2026 South Korean energy firm SGC Energy has partnered with Vertiv to maximize the efficiency of power and cooling solutions at SGC's planned data center in Gunsan, South Korea. The companies signed a non-binding Memorandum of Understanding, under which they will conduct joint technical reviews of the infrastructure for the AI data center. As part of the agreement, Vertiv plans to deploy its integrated power solution, PowerNexus, at the site, marking the first deployment of the system in South Korea. PowerNexus is a fully integrated system that combines a high-capacity uninterruptible power supply (UPS) and system switchgear into a single, factory-assembled block. According to the company, the system's modular nature means that it can be deployed up to 70 percent faster than alternatives and lower installation costs by up to 20 percent. "We plan to accelerate the construction of an unrivaled AI data center based on the close partnership between SGC Energy and Vertiv," said Hwang Se-hoon, an executive director at SGC Energy. "Because the AI data center business is a new growth pillar for the company, we will do everything possible to push the project forward without setbacks." News on SGC's data center was first revealed in February this year. The project will have a capacity of 60MW in its initial phase, with the potential to scale to up to 300MW at full buildout. Energization of the first phase is expected in Q1 2028. The 300MW facility will be built at the Gunsan National Industrial Complex 2, the largest of two industrial areas located around Gunsan that house shipbuilding facilities, power plants, battery production facilities, and more. According to the company, the data center will be built on approximately 100,000 sq ft (9,290 sqm) of land already owned by SGC Green Power, an affiliate of SGC Energy. More in asia pacific.

Yahoo Finance
Sep 5th, 2026
3 AI stocks off highs: Vertiv, Applied Optoelectronics and Innodata pullback explained

Three AI-related stocks — Vertiv Holdings, Applied Optoelectronics, and Innodata — are trading well below their 2026 highs despite strong operational growth. Vertiv's second-quarter sales rose 24% to $3.27 billion, with adjusted operating margin expanding 410 basis points to 22.6%. The company sells power and cooling solutions for AI infrastructure. Insider Monkey counted 112 hedge funds holding Vertiv in Q2, up from 96 in Q1. Applied Optoelectronics posted record revenue of $191.9 million, with 800G volume more than doubling from Q1. Management expects 800G and 1.6-terabit demand to exceed production capacity through mid-2027. However, the company reported a $22.8 million GAAP loss. Innodata's revenue grew 58% to $92.1 million, with adjusted EBITDA rising 92% to $25.4 million. The company provides data engineering and model-evaluation services for AI applications. Each stock faces distinct risks around timing, customer concentration, and operational execution.